Construction of cast in situ bored pile / Nurhamizah Md Anuar

This report briefly explained the work methodology of Construction of Cast In Situ Bored Pile. In this report, various important aspects involved to make it work as well as it is a fundamentally important element especially in infrastructure development. This report is completed during the practical...

Full description

Saved in:
Bibliographic Details
Main Author: Md Anuar, Nurhamizah
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2012
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/77228/1/77228.pdf
https://ir.uitm.edu.my/id/eprint/77228/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.77228
record_format eprints
spelling my.uitm.ir.772282023-12-05T01:44:20Z https://ir.uitm.edu.my/id/eprint/77228/ Construction of cast in situ bored pile / Nurhamizah Md Anuar Md Anuar, Nurhamizah Details in building design and construction.Including walls, roofs This report briefly explained the work methodology of Construction of Cast In Situ Bored Pile. In this report, various important aspects involved to make it work as well as it is a fundamentally important element especially in infrastructure development. This report is completed during the practical training at the construction site of Kelana Jaya (KLJ) Railway Extension Project in Trans Resources Corporation Sdn. Bhd. for 5 months. This report has been divided into sections for ease of understanding to those who read it. This section starts from the introduction, company background, and the work methodology (practical). This study includes theoretical study of resource website, interviews with individuals who are experienced and study for 5 months. During the practical training are on site, the construction work for bored pile works is not as easy as in thought. This is because the work involves a lot of work to be done. For example, the construction work should be completed boring a hole, the borehole need to be clean and free from soil collapse. The. study results found that, the management relies heavily on the outcome of the discussions between the parties involved in the project compared with reference to the clauses contained in the contract for the work -this bored pile work. In addition, there are also have more exposure gained on the process of infrastructure work undertaken in accordance with the field that related to Diploma in Building. Universiti Teknologi MARA, Perak 2012-10 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/77228/1/77228.pdf Construction of cast in situ bored pile / Nurhamizah Md Anuar. (2012) Industrial Training. Universiti Teknologi MARA, Perak. <http://terminalib.uitm.edu.my/77228.pdf> (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Details in building design and construction.Including walls, roofs
spellingShingle Details in building design and construction.Including walls, roofs
Md Anuar, Nurhamizah
Construction of cast in situ bored pile / Nurhamizah Md Anuar
description This report briefly explained the work methodology of Construction of Cast In Situ Bored Pile. In this report, various important aspects involved to make it work as well as it is a fundamentally important element especially in infrastructure development. This report is completed during the practical training at the construction site of Kelana Jaya (KLJ) Railway Extension Project in Trans Resources Corporation Sdn. Bhd. for 5 months. This report has been divided into sections for ease of understanding to those who read it. This section starts from the introduction, company background, and the work methodology (practical). This study includes theoretical study of resource website, interviews with individuals who are experienced and study for 5 months. During the practical training are on site, the construction work for bored pile works is not as easy as in thought. This is because the work involves a lot of work to be done. For example, the construction work should be completed boring a hole, the borehole need to be clean and free from soil collapse. The. study results found that, the management relies heavily on the outcome of the discussions between the parties involved in the project compared with reference to the clauses contained in the contract for the work -this bored pile work. In addition, there are also have more exposure gained on the process of infrastructure work undertaken in accordance with the field that related to Diploma in Building.
format Monograph
author Md Anuar, Nurhamizah
author_facet Md Anuar, Nurhamizah
author_sort Md Anuar, Nurhamizah
title Construction of cast in situ bored pile / Nurhamizah Md Anuar
title_short Construction of cast in situ bored pile / Nurhamizah Md Anuar
title_full Construction of cast in situ bored pile / Nurhamizah Md Anuar
title_fullStr Construction of cast in situ bored pile / Nurhamizah Md Anuar
title_full_unstemmed Construction of cast in situ bored pile / Nurhamizah Md Anuar
title_sort construction of cast in situ bored pile / nurhamizah md anuar
publisher Universiti Teknologi MARA, Perak
publishDate 2012
url https://ir.uitm.edu.my/id/eprint/77228/1/77228.pdf
https://ir.uitm.edu.my/id/eprint/77228/
_version_ 1784517497360220160
score 13.18916