Building plan approval process / Muhammad Afiq Che Roha

This report briefly explain about process of building plan approval. Objective of this report to study the process involve in building plan approval and to identify the problem occur during the building plan approval. Method of study is divided into two methods which are observation and interview me...

Full description

Saved in:
Bibliographic Details
Main Author: Che Roha, Muhammad Afiq
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2014
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/77219/1/77219.pdf
https://ir.uitm.edu.my/id/eprint/77219/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.77219
record_format eprints
spelling my.uitm.ir.772192023-12-05T01:44:27Z https://ir.uitm.edu.my/id/eprint/77219/ Building plan approval process / Muhammad Afiq Che Roha Che Roha, Muhammad Afiq Building inspection This report briefly explain about process of building plan approval. Objective of this report to study the process involve in building plan approval and to identify the problem occur during the building plan approval. Method of study is divided into two methods which are observation and interview method. In observation of study method, this process carried out in working hours. This process begins when the applicant submit the plan at One-Stop (OSC) counter and next processes will be conducted until approval issued by Pasir Mas District Council. In addition, for the interviews conducted during writer methods do practical training. This method can provide a lot of accurate information by interviewing the Mr. Azmi, Mr Kamarul. They were given are goods information to me. Through this method, it is a bit of give and help to the writer to gather information about the research topic of the process approve plan by the Pasir Mas Local Authority method. The finding from this report is the of process of building plan approval is start from applicant send apply to Pasir Mas District Council of One-Stop Centre (OSC) unit, revised application by One-Stop Centre (OSC) unit, checking by technical department, One-Stop Centre (OSC) committee meeting and building plan approval letter give to applicant. Hope with this report can give a lot of advantage and benefit to the render on how to process of building plan approval and the problem occurred. Universiti Teknologi MARA, Perak 2014-09 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/77219/1/77219.pdf Building plan approval process / Muhammad Afiq Che Roha. (2014) Industrial Training. Universiti Teknologi MARA, Perak. <http://terminalib.uitm.edu.my/77219.pdf> (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Building inspection
spellingShingle Building inspection
Che Roha, Muhammad Afiq
Building plan approval process / Muhammad Afiq Che Roha
description This report briefly explain about process of building plan approval. Objective of this report to study the process involve in building plan approval and to identify the problem occur during the building plan approval. Method of study is divided into two methods which are observation and interview method. In observation of study method, this process carried out in working hours. This process begins when the applicant submit the plan at One-Stop (OSC) counter and next processes will be conducted until approval issued by Pasir Mas District Council. In addition, for the interviews conducted during writer methods do practical training. This method can provide a lot of accurate information by interviewing the Mr. Azmi, Mr Kamarul. They were given are goods information to me. Through this method, it is a bit of give and help to the writer to gather information about the research topic of the process approve plan by the Pasir Mas Local Authority method. The finding from this report is the of process of building plan approval is start from applicant send apply to Pasir Mas District Council of One-Stop Centre (OSC) unit, revised application by One-Stop Centre (OSC) unit, checking by technical department, One-Stop Centre (OSC) committee meeting and building plan approval letter give to applicant. Hope with this report can give a lot of advantage and benefit to the render on how to process of building plan approval and the problem occurred.
format Monograph
author Che Roha, Muhammad Afiq
author_facet Che Roha, Muhammad Afiq
author_sort Che Roha, Muhammad Afiq
title Building plan approval process / Muhammad Afiq Che Roha
title_short Building plan approval process / Muhammad Afiq Che Roha
title_full Building plan approval process / Muhammad Afiq Che Roha
title_fullStr Building plan approval process / Muhammad Afiq Che Roha
title_full_unstemmed Building plan approval process / Muhammad Afiq Che Roha
title_sort building plan approval process / muhammad afiq che roha
publisher Universiti Teknologi MARA, Perak
publishDate 2014
url https://ir.uitm.edu.my/id/eprint/77219/1/77219.pdf
https://ir.uitm.edu.my/id/eprint/77219/
_version_ 1784517497070813184
score 13.211869