Installation of Novec 1230 supression system / Mohd Shazali Che Lah
This report briefly explains about process of installation of fire suspension using novec 1230 system. It was completed throughout the experience during the 5 months practical training at Eastco Engineering Sdn. Bhd. Even though directly involved with the project, based on the observation of the ins...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2013
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/77181/1/77181.pdf https://ir.uitm.edu.my/id/eprint/77181/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|