Industrialized building system on Health Office of Negeri Kedah / Norliyana Syahirah Muhamad Radhi
This report briefly on the methods and processes involved in the health office building that uses the IBS system on the walls and floors. This report is generated based on the experiences of six months at the project site. This report is divided into several sections and begins with the company back...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2010
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/77169/1/77169.pdf https://ir.uitm.edu.my/id/eprint/77169/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.77169 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.771692023-09-21T04:49:29Z https://ir.uitm.edu.my/id/eprint/77169/ Industrialized building system on Health Office of Negeri Kedah / Norliyana Syahirah Muhamad Radhi Muhamad Radhi, Norliyana Syahirah Systems of building construction. Industrialized building This report briefly on the methods and processes involved in the health office building that uses the IBS system on the walls and floors. This report is generated based on the experiences of six months at the project site. This report is divided into several sections and begins with the company background and the background of the construction project. Hatimuda Sdn. Bhd. is a practical place occupied by the author of a six-month observations revealed that the construction of walls and floors of a building by using IBS system is not easy as in thought. It involves many person and the construction process is complex. In this report, are described briefly on the theoretical study, including the types and the advantage and disadvantages of using IBS. Then described in more detail about the methods involved and used in the construction of walls and floors as well as installation of services. During the construction process is on going, some of the problems associated with wall and floor construction to solve the perceived problems identified. In conclusion, this report can be expected to explain in more detail to the reader on the wall and floor construction method using the IBS system in practically. Universiti Teknologi MARA, Perak 2010 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/77169/1/77169.pdf Industrialized building system on Health Office of Negeri Kedah / Norliyana Syahirah Muhamad Radhi. (2010) Industrial Training. Universiti Teknologi MARA, Perak. <http://terminalib.uitm.edu.my/77169.pdf> (Submitted) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Systems of building construction. Industrialized building |
spellingShingle |
Systems of building construction. Industrialized building Muhamad Radhi, Norliyana Syahirah Industrialized building system on Health Office of Negeri Kedah / Norliyana Syahirah Muhamad Radhi |
description |
This report briefly on the methods and processes involved in the health office building that uses the IBS system on the walls and floors. This report is generated based on the experiences of six months at the project site. This report is divided into several sections and begins with the company background and the background of the construction project. Hatimuda Sdn. Bhd. is a practical place occupied by the author of a six-month observations revealed that the construction of walls and floors of a building by using IBS system is not easy as in thought. It involves many person and the construction process is complex. In this report, are described briefly on the theoretical study, including the types and the advantage and disadvantages of using IBS. Then described in more detail about the methods involved and used in the construction of walls and floors as well as installation of services. During the construction process is on going, some of the problems associated with wall and floor construction to solve the perceived problems identified. In conclusion, this report can be expected to explain in more detail to the reader on the wall and floor construction method using the IBS system in practically. |
format |
Monograph |
author |
Muhamad Radhi, Norliyana Syahirah |
author_facet |
Muhamad Radhi, Norliyana Syahirah |
author_sort |
Muhamad Radhi, Norliyana Syahirah |
title |
Industrialized building system on Health Office of Negeri Kedah / Norliyana Syahirah Muhamad Radhi |
title_short |
Industrialized building system on Health Office of Negeri Kedah / Norliyana Syahirah Muhamad Radhi |
title_full |
Industrialized building system on Health Office of Negeri Kedah / Norliyana Syahirah Muhamad Radhi |
title_fullStr |
Industrialized building system on Health Office of Negeri Kedah / Norliyana Syahirah Muhamad Radhi |
title_full_unstemmed |
Industrialized building system on Health Office of Negeri Kedah / Norliyana Syahirah Muhamad Radhi |
title_sort |
industrialized building system on health office of negeri kedah / norliyana syahirah muhamad radhi |
publisher |
Universiti Teknologi MARA, Perak |
publishDate |
2010 |
url |
https://ir.uitm.edu.my/id/eprint/77169/1/77169.pdf https://ir.uitm.edu.my/id/eprint/77169/ |
_version_ |
1778165872817340416 |
score |
13.211869 |