Preliminary construction of reservoir water level control / Muhammad lkmal Ariff Azmee
This report briefly describes the processes and methods involved in the preliminary construction of a reservoir water level control. It was developed based on the experience of a five-month detention at a construction site. This report is divided into several parts and started with the title report,...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2012
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/77124/1/77124.pdf https://ir.uitm.edu.my/id/eprint/77124/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|