Ineffective implementation of risk management among sub contractors in northern area / Nurqameela Md Radzi

Construction industry is known as a high-risk activity as due to the nature of its work. It is crucial to manage the risk by all levels of multidisciplinary operations. Construction activities are exposed to hazardous situation and an unpredictable incident during the execution of the project. Any u...

Full description

Saved in:
Bibliographic Details
Main Author: Md Radzi, Nurqameela
Format: Thesis
Language:English
Published: 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/76573/1/76573.pdf
https://ir.uitm.edu.my/id/eprint/76573/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.76573
record_format eprints
spelling my.uitm.ir.765732023-05-29T03:27:30Z https://ir.uitm.edu.my/id/eprint/76573/ Ineffective implementation of risk management among sub contractors in northern area / Nurqameela Md Radzi Md Radzi, Nurqameela Risk management. Risk in industry. Operational risk Construction industry Construction industry is known as a high-risk activity as due to the nature of its work. It is crucial to manage the risk by all levels of multidisciplinary operations. Construction activities are exposed to hazardous situation and an unpredictable incident during the execution of the project. Any unwanted incident would contribute to project failure or delay. One of the main issues triggered by sub-contractors task is the failure to effectively manage the risk caused by main contractors. This research, therefore, aims to assist sub-contractors to overcome this situation. This study has developed three (3) objectives; (i) to identify the factors that contribute to ineffective implementation among Sub-Contractors, (ii) to determine the impacts due to ineffective implementation risk management and (iii) to propose the strategy to overcome the ineffective implementation of risk management. The research methodology adopted was the questionnaire survey analysis based on 300 respondents from sub-contractors among G1 to G4 in the northern state of East Malaysia. Findings show that there are four (4) significant factors that contribute to ineffective implementation of risk management among subcontractors namely lack coordination between parties, slow information between parties, accessibility of material and unclear goals. In addition, eight (8) criteria are impactful to the project due to failure in implementing proper risk management. These criteria are plant and machineries cost, waiting approval from authorities, contractor late site possession, material delay to site, unexpected bad even happened, insufficient resources, failure to adhere to SOP and improper supervision. Lastly, respondents agreed that there are ten (10) criteria that could improve risk management among subcontractors in northern Malaysia: effective site management and supervision; experienced contractor; good feasibility studies; understanding of the project before the execution; thoroughly investigate vendor capabilities; frequent progress meeting; frequent coordination between parties; sufficient allocation of resources; keeping project in the right path and proper identification of risk. By identifying the risk before executing a project the contractor will be able to minimize or mitigate a lot of challenges and problems that they face. 2022 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/76573/1/76573.pdf Ineffective implementation of risk management among sub contractors in northern area / Nurqameela Md Radzi. (2022) Masters thesis, thesis, Universiti Teknologi MARA (UiTM). <http://terminalib.uitm.edu.my/76573.pdf>
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Risk management. Risk in industry. Operational risk
Construction industry
spellingShingle Risk management. Risk in industry. Operational risk
Construction industry
Md Radzi, Nurqameela
Ineffective implementation of risk management among sub contractors in northern area / Nurqameela Md Radzi
description Construction industry is known as a high-risk activity as due to the nature of its work. It is crucial to manage the risk by all levels of multidisciplinary operations. Construction activities are exposed to hazardous situation and an unpredictable incident during the execution of the project. Any unwanted incident would contribute to project failure or delay. One of the main issues triggered by sub-contractors task is the failure to effectively manage the risk caused by main contractors. This research, therefore, aims to assist sub-contractors to overcome this situation. This study has developed three (3) objectives; (i) to identify the factors that contribute to ineffective implementation among Sub-Contractors, (ii) to determine the impacts due to ineffective implementation risk management and (iii) to propose the strategy to overcome the ineffective implementation of risk management. The research methodology adopted was the questionnaire survey analysis based on 300 respondents from sub-contractors among G1 to G4 in the northern state of East Malaysia. Findings show that there are four (4) significant factors that contribute to ineffective implementation of risk management among subcontractors namely lack coordination between parties, slow information between parties, accessibility of material and unclear goals. In addition, eight (8) criteria are impactful to the project due to failure in implementing proper risk management. These criteria are plant and machineries cost, waiting approval from authorities, contractor late site possession, material delay to site, unexpected bad even happened, insufficient resources, failure to adhere to SOP and improper supervision. Lastly, respondents agreed that there are ten (10) criteria that could improve risk management among subcontractors in northern Malaysia: effective site management and supervision; experienced contractor; good feasibility studies; understanding of the project before the execution; thoroughly investigate vendor capabilities; frequent progress meeting; frequent coordination between parties; sufficient allocation of resources; keeping project in the right path and proper identification of risk. By identifying the risk before executing a project the contractor will be able to minimize or mitigate a lot of challenges and problems that they face.
format Thesis
author Md Radzi, Nurqameela
author_facet Md Radzi, Nurqameela
author_sort Md Radzi, Nurqameela
title Ineffective implementation of risk management among sub contractors in northern area / Nurqameela Md Radzi
title_short Ineffective implementation of risk management among sub contractors in northern area / Nurqameela Md Radzi
title_full Ineffective implementation of risk management among sub contractors in northern area / Nurqameela Md Radzi
title_fullStr Ineffective implementation of risk management among sub contractors in northern area / Nurqameela Md Radzi
title_full_unstemmed Ineffective implementation of risk management among sub contractors in northern area / Nurqameela Md Radzi
title_sort ineffective implementation of risk management among sub contractors in northern area / nurqameela md radzi
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/76573/1/76573.pdf
https://ir.uitm.edu.my/id/eprint/76573/
_version_ 1768011586550628352
score 13.160551