Key elements of Building Information Modeling (BIM) for BIM-based projects / Wan Nur Syazwani Wan Mohammad ... [et al.]

BIM is introduced to support the fourth Industrial Revolution 4.0 (IR4.0) in the construction industry. Through BIM, the construction information is stored, supplied, and received in one single respiratory system which enables the BIM-based project team to interact and collaborate in real-time throu...

Full description

Saved in:
Bibliographic Details
Main Authors: Wan Mohammad, Wan Nur Syazwani, Abdullah, Mohd Rofdzi, Ismail, Sallehan, Takim, Roshana
Format: Conference or Workshop Item
Language:English
Published: 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/73586/1/73586.pdf
https://ir.uitm.edu.my/id/eprint/73586/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.73586
record_format eprints
spelling my.uitm.ir.735862023-03-21T02:10:56Z https://ir.uitm.edu.my/id/eprint/73586/ Key elements of Building Information Modeling (BIM) for BIM-based projects / Wan Nur Syazwani Wan Mohammad ... [et al.] Wan Mohammad, Wan Nur Syazwani Abdullah, Mohd Rofdzi Ismail, Sallehan Takim, Roshana Management of the construction site. Superintendence of building construction Construction by phase of the work (Building trades) BIM is introduced to support the fourth Industrial Revolution 4.0 (IR4.0) in the construction industry. Through BIM, the construction information is stored, supplied, and received in one single respiratory system which enables the BIM-based project team to interact and collaborate in real-time throughout the project life cycle. Nevertheless, the BIM adoption performance among contractors is relatively low for their projects. One of the reasons is that there is a lack of overarching key elements identified from the previous study of BIM assessment models. The objective of this study is to identify the key elements of BIM used for BIM-based projects adopted from various BIM assessment models. A systematic literature review from various BIM assessment models in the United States, United Kingdom, Netherland, Australia, China, South Korea, and Malaysia was conducted. The findings revealed that four (4) key elements to be considered. These are BIM objectives, BIM uses, BIM adoption components, and project performance criteria. The deliberated key elements cover the assessment of BIM-based projects’ performance (i.e., time, cost, quality, and safety) across construction project phases. Hence, the outcomes of this paper could help BIM stakeholders in particular contractors to comprehend various key elements for BIM-based projects in Malaysia. 2022 Conference or Workshop Item PeerReviewed text en https://ir.uitm.edu.my/id/eprint/73586/1/73586.pdf Key elements of Building Information Modeling (BIM) for BIM-based projects / Wan Nur Syazwani Wan Mohammad ... [et al.]. (2022) In: e-Proceedings V-GoGreen 2021: Virtual Go Green: Conference and Publication, 29-30 September 2021, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Management of the construction site. Superintendence of building construction
Construction by phase of the work (Building trades)
spellingShingle Management of the construction site. Superintendence of building construction
Construction by phase of the work (Building trades)
Wan Mohammad, Wan Nur Syazwani
Abdullah, Mohd Rofdzi
Ismail, Sallehan
Takim, Roshana
Key elements of Building Information Modeling (BIM) for BIM-based projects / Wan Nur Syazwani Wan Mohammad ... [et al.]
description BIM is introduced to support the fourth Industrial Revolution 4.0 (IR4.0) in the construction industry. Through BIM, the construction information is stored, supplied, and received in one single respiratory system which enables the BIM-based project team to interact and collaborate in real-time throughout the project life cycle. Nevertheless, the BIM adoption performance among contractors is relatively low for their projects. One of the reasons is that there is a lack of overarching key elements identified from the previous study of BIM assessment models. The objective of this study is to identify the key elements of BIM used for BIM-based projects adopted from various BIM assessment models. A systematic literature review from various BIM assessment models in the United States, United Kingdom, Netherland, Australia, China, South Korea, and Malaysia was conducted. The findings revealed that four (4) key elements to be considered. These are BIM objectives, BIM uses, BIM adoption components, and project performance criteria. The deliberated key elements cover the assessment of BIM-based projects’ performance (i.e., time, cost, quality, and safety) across construction project phases. Hence, the outcomes of this paper could help BIM stakeholders in particular contractors to comprehend various key elements for BIM-based projects in Malaysia.
format Conference or Workshop Item
author Wan Mohammad, Wan Nur Syazwani
Abdullah, Mohd Rofdzi
Ismail, Sallehan
Takim, Roshana
author_facet Wan Mohammad, Wan Nur Syazwani
Abdullah, Mohd Rofdzi
Ismail, Sallehan
Takim, Roshana
author_sort Wan Mohammad, Wan Nur Syazwani
title Key elements of Building Information Modeling (BIM) for BIM-based projects / Wan Nur Syazwani Wan Mohammad ... [et al.]
title_short Key elements of Building Information Modeling (BIM) for BIM-based projects / Wan Nur Syazwani Wan Mohammad ... [et al.]
title_full Key elements of Building Information Modeling (BIM) for BIM-based projects / Wan Nur Syazwani Wan Mohammad ... [et al.]
title_fullStr Key elements of Building Information Modeling (BIM) for BIM-based projects / Wan Nur Syazwani Wan Mohammad ... [et al.]
title_full_unstemmed Key elements of Building Information Modeling (BIM) for BIM-based projects / Wan Nur Syazwani Wan Mohammad ... [et al.]
title_sort key elements of building information modeling (bim) for bim-based projects / wan nur syazwani wan mohammad ... [et al.]
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/73586/1/73586.pdf
https://ir.uitm.edu.my/id/eprint/73586/
_version_ 1761622336492011520
score 13.211869