Construction of single storey bungalow interlocking brick house / Ain Zulaikha Fadzli

Industrialised Building System (IBS) are also known as pre-fabrication that involve the manufacture of off-site components installation method has been introduced since 1960. Since 2003, the Malaysian government has been constantly encouraging the building sector to use the IBS method of constructio...

Full description

Saved in:
Bibliographic Details
Main Author: Fadzli, Ain Zulaikha
Format: Student Project
Language:English
Published: 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/72816/1/72816.pdf
https://ir.uitm.edu.my/id/eprint/72816/
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first