Proposed sewerage system for Seremban town (Phase one) / Kamsiah Abd Karim

A central sewerage treatment is proposed and is located at Kg Kuala Sawah. It comprises of anacrobic, facultative and maturation ponds. The effluent quality discharge by the maturation pond is expected to have BOD less than 50 mg/l with 1494 FC/100 ml.

Saved in:
Bibliographic Details
Main Authors: Abd Karim, Kamsiah, Taib, Halimah
Format: Research Reports
Language:English
Published: 1988
Online Access:https://ir.uitm.edu.my/id/eprint/71980/1/71980.PDF
https://ir.uitm.edu.my/id/eprint/71980/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items