Covid-19: best practices on Standard Operating Procedure (SOP) implementation at construction sites / Wan Amni Aizah Megat Abdullah

Phenomena Covid-19 in Malaysia was happened in December 2019 until now 2021, and the construction industry has to stop immediately because of the Movement Control Order (MCO) in 2020. After MCO 1.0 for 6 month, construction started operation with the best practices standards operating procedure (SOP...

Full description

Saved in:
Bibliographic Details
Main Author: Megat Abdullah, Wan Amni Aizah
Format: Student Project
Language:English
Published: 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/71602/1/71602.pdf
https://ir.uitm.edu.my/id/eprint/71602/
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first