The Industrialized Building System (IBS) as an alternative to the conventional construction method / Nurul Fatin Idayu Azman
Malaysia construction sector currently face a significant demand in development. This influenced the rise of projects in the construction sector however causing several issues regarding quality and productivity of project and there is a rise of project abandoned due to financial issues. IBS is a con...
Saved in:
Main Author: | Azman, Nurul Fatin Idayu |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/71577/1/71577.pdf https://ir.uitm.edu.my/id/eprint/71577/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Challenging of Industrialized Building System (IBS) in construction process during COVID-19 in Malaysia / Alyani Izzati Mohd Zainal
by: Mohd Zainal, Alyani Izzati
Published: (2021) -
Defect inspection for house construction / Nurul Fatin Idayu Azman
by: Azman, Nurul Fatin Idayu
Published: (2022) -
A study on the construction and demolistion waste management at site Klang Valley / Nurul Yasarah Mohamad
by: Mohamad, Nurul Yasarah
Published: (2021) -
Tendering process for renovation work case study: Maybank Malayan Banking / Nurul Asyiah Mohamad Fua’at
by: Mohamad Fua’at, Nurul Asyiah
Published: (2013) -
Key elements of Building Information Modeling (BIM) for BIM-based projects / Wan Nur Syazwani Wan Mohammad ... [et al.]
by: Wan Mohammad, Wan Nur Syazwani, et al.
Published: (2022)