It is widely known that a dangerous infectious disease known as COVID-19 has wreaked havoc on all corners of the globe. Malaysia is another country that is battling the spread of the disease. Every individual and sector has had a new experience as a result of the disease in their daily lives. The In...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Zainal, Alyani Izzati
Format: Student Project
Language:English
Published: 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/71532/1/71532.pdf
https://ir.uitm.edu.my/id/eprint/71532/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.71532
record_format eprints
spelling my.uitm.ir.715322023-04-06T08:45:56Z https://ir.uitm.edu.my/id/eprint/71532/ Challenging of Industrialized Building System (IBS) in construction process during COVID-19 in Malaysia / Alyani Izzati Mohd Zainal Mohd Zainal, Alyani Izzati TH Building construction Management of the construction site. Superintendence of building construction Construction by phase of the work (Building trades) It is widely known that a dangerous infectious disease known as COVID-19 has wreaked havoc on all corners of the globe. Malaysia is another country that is battling the spread of the disease. Every individual and sector has had a new experience as a result of the disease in their daily lives. The Industrialized Building System (IBS) construction sector is also affected in this situation. There are several problems faced by IBS contractors during this pandemic such as project delay, difficulty in communicating between teams, many standard operating procedures (SOPs) that need to be followed to curb the release of COVID-19 on site where this will slow down work on site and so on. The objective of this research is to explore the challenges faced by contractors involved in IBS construction during the pandemic and to suggest the best possible factors that affect IBS System in construction process during COVID-19. This study uses qualitative and quantitative methods. The qualitative method was conducted in a virtual interview with two respondents, which is contractors from different companies and the quantitative method was conducted through the distribution of questionnaires to Email, WhatsApp and Facebook in the form. Through the findings of the study, out of 9 factors asked, only 7 factors are critical during this pandemic season, which is limited IBS production results in additional operational costs to suppliers and recipients, communication between stakeholders (manufacturers, contractors, architecture, developers etc.), problems acceptance of different individual understandings, some individuals are less committed, transportation is critical issues affecting supply chain, the limited number of employees and time has resulted in limited delivery of products to the site and several conditions need to be met for cross -state. Since most of the respondents agreed that the use of IBS helps in curbing the transmission of COVID-19 at the site, several recommendations have been proposed in this research to encourage the use of IBS during a pandemic. 2021 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/71532/1/71532.pdf Challenging of Industrialized Building System (IBS) in construction process during COVID-19 in Malaysia / Alyani Izzati Mohd Zainal. (2021) [Student Project] <http://terminalib.uitm.edu.my/71532.pdf>
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Management of the construction site. Superintendence of building construction
Construction by phase of the work (Building trades)
spellingShingle TH Building construction
Management of the construction site. Superintendence of building construction
Construction by phase of the work (Building trades)
Mohd Zainal, Alyani Izzati
Challenging of Industrialized Building System (IBS) in construction process during COVID-19 in Malaysia / Alyani Izzati Mohd Zainal
description It is widely known that a dangerous infectious disease known as COVID-19 has wreaked havoc on all corners of the globe. Malaysia is another country that is battling the spread of the disease. Every individual and sector has had a new experience as a result of the disease in their daily lives. The Industrialized Building System (IBS) construction sector is also affected in this situation. There are several problems faced by IBS contractors during this pandemic such as project delay, difficulty in communicating between teams, many standard operating procedures (SOPs) that need to be followed to curb the release of COVID-19 on site where this will slow down work on site and so on. The objective of this research is to explore the challenges faced by contractors involved in IBS construction during the pandemic and to suggest the best possible factors that affect IBS System in construction process during COVID-19. This study uses qualitative and quantitative methods. The qualitative method was conducted in a virtual interview with two respondents, which is contractors from different companies and the quantitative method was conducted through the distribution of questionnaires to Email, WhatsApp and Facebook in the form. Through the findings of the study, out of 9 factors asked, only 7 factors are critical during this pandemic season, which is limited IBS production results in additional operational costs to suppliers and recipients, communication between stakeholders (manufacturers, contractors, architecture, developers etc.), problems acceptance of different individual understandings, some individuals are less committed, transportation is critical issues affecting supply chain, the limited number of employees and time has resulted in limited delivery of products to the site and several conditions need to be met for cross -state. Since most of the respondents agreed that the use of IBS helps in curbing the transmission of COVID-19 at the site, several recommendations have been proposed in this research to encourage the use of IBS during a pandemic.
format Student Project
author Mohd Zainal, Alyani Izzati
author_facet Mohd Zainal, Alyani Izzati
author_sort Mohd Zainal, Alyani Izzati
title Challenging of Industrialized Building System (IBS) in construction process during COVID-19 in Malaysia / Alyani Izzati Mohd Zainal
title_short Challenging of Industrialized Building System (IBS) in construction process during COVID-19 in Malaysia / Alyani Izzati Mohd Zainal
title_full Challenging of Industrialized Building System (IBS) in construction process during COVID-19 in Malaysia / Alyani Izzati Mohd Zainal
title_fullStr Challenging of Industrialized Building System (IBS) in construction process during COVID-19 in Malaysia / Alyani Izzati Mohd Zainal
title_full_unstemmed Challenging of Industrialized Building System (IBS) in construction process during COVID-19 in Malaysia / Alyani Izzati Mohd Zainal
title_sort challenging of industrialized building system (ibs) in construction process during covid-19 in malaysia / alyani izzati mohd zainal
publishDate 2021
url https://ir.uitm.edu.my/id/eprint/71532/1/71532.pdf
https://ir.uitm.edu.my/id/eprint/71532/
_version_ 1762841151513034752
score 13.154949