Production design of GRP Payang potong belakang / Amirul Hakim Baharizam

This project is about the Production Design of a GRP Payang Boat with a mounted motor engine. Payang Boat is a traditional open fishing boat that originated from the east coast part of Malaysia. With the accomplishment of this project, it will help in fulfilling the daily activities of people who ut...

Full description

Saved in:
Bibliographic Details
Main Author: Baharizam, Amirul Hakim
Format: Student Project
Language:English
Published: 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/71107/1/71107.pdf
https://ir.uitm.edu.my/id/eprint/71107/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.71107
record_format eprints
spelling my.uitm.ir.711072023-01-10T04:05:16Z https://ir.uitm.edu.my/id/eprint/71107/ Production design of GRP Payang potong belakang / Amirul Hakim Baharizam Baharizam, Amirul Hakim Engineering design Mechanical and electrical engineering combined Mechanics applied to machinery. Dynamics Mechanical movements Machine design and drawing Machine construction (General) This project is about the Production Design of a GRP Payang Boat with a mounted motor engine. Payang Boat is a traditional open fishing boat that originated from the east coast part of Malaysia. With the accomplishment of this project, it will help in fulfilling the daily activities of people who utilize Payang Boats on daily occasions especially fishermen. One of this project aim is to replace the original raw materials of a Payang Boat to a much more modern one. Other than that, the chosen raw material and method of construction is determined by using a method called Pugh chart where every item is given a score of -1, 0 or 1 depending on whether they suit the criteria given or not. At the end of this project it is expected to achieve the suitable method of construction and a detail drawing of the result which will be made on FYP2. 2022 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/71107/1/71107.pdf Production design of GRP Payang potong belakang / Amirul Hakim Baharizam. (2022) [Student Project] <http://terminalib.uitm.edu.my/71107.pdf> (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Engineering design
Mechanical and electrical engineering combined
Mechanics applied to machinery. Dynamics
Mechanical movements
Machine design and drawing
Machine construction (General)
spellingShingle Engineering design
Mechanical and electrical engineering combined
Mechanics applied to machinery. Dynamics
Mechanical movements
Machine design and drawing
Machine construction (General)
Baharizam, Amirul Hakim
Production design of GRP Payang potong belakang / Amirul Hakim Baharizam
description This project is about the Production Design of a GRP Payang Boat with a mounted motor engine. Payang Boat is a traditional open fishing boat that originated from the east coast part of Malaysia. With the accomplishment of this project, it will help in fulfilling the daily activities of people who utilize Payang Boats on daily occasions especially fishermen. One of this project aim is to replace the original raw materials of a Payang Boat to a much more modern one. Other than that, the chosen raw material and method of construction is determined by using a method called Pugh chart where every item is given a score of -1, 0 or 1 depending on whether they suit the criteria given or not. At the end of this project it is expected to achieve the suitable method of construction and a detail drawing of the result which will be made on FYP2.
format Student Project
author Baharizam, Amirul Hakim
author_facet Baharizam, Amirul Hakim
author_sort Baharizam, Amirul Hakim
title Production design of GRP Payang potong belakang / Amirul Hakim Baharizam
title_short Production design of GRP Payang potong belakang / Amirul Hakim Baharizam
title_full Production design of GRP Payang potong belakang / Amirul Hakim Baharizam
title_fullStr Production design of GRP Payang potong belakang / Amirul Hakim Baharizam
title_full_unstemmed Production design of GRP Payang potong belakang / Amirul Hakim Baharizam
title_sort production design of grp payang potong belakang / amirul hakim baharizam
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/71107/1/71107.pdf
https://ir.uitm.edu.my/id/eprint/71107/
_version_ 1755876037821988864
score 13.214268