Problems of installation of precast concrete beam and column frame structure of Industrialized Building System (IBS) in Malaysia / Nurshafiqa Aqilla Aman
Industrialzed Building System (IBS) is one of the method of construction that more systematic and mechanices than conventional construction method and this system were adoption in Malaysia since 1960s. An Industrialized Building System (IBS) can be defined as a construction method in which all build...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/70778/1/70778.pdf https://ir.uitm.edu.my/id/eprint/70778/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Industrialzed Building System (IBS) is one of the method of construction that more systematic and mechanices than conventional construction method and this system were adoption in Malaysia since 1960s. An Industrialized Building System (IBS) can be defined as a construction method in which all building components, such as walls, slabs, beams, columns, and staircases, are manufacture in a factory or off site to reduce work on site and control the environnent. The aim of the study is to increase the understanding the problems of installation of precast concrete beam and column frame structure of Industrialized Building System (IBS) in Malaysia. Objective of this research are to identify the installation of precast concrete beam and column frame in IBS system. This study is conducted in two methods, which is by referring to the literature review and field study. Therefore, the expecting from this study is to understand the beam and column frame of IBS system. |
---|