Zainal & Din Construction Sdn. Bhd. / Mohammad Syabil Azmi

The motive of the industrial training are mainly to let the student to gather some of experiences from real time job for students to further studies onto higher degree. By letting the students experienced such things, the students are able to apply the knowledge that they have learnt from attending...

Full description

Saved in:
Bibliographic Details
Main Author: Azmi, Mohammad Syabil
Format: Monograph
Language:English
Published: Faculty of Civil Engineering 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/69791/1/69791.pdf
https://ir.uitm.edu.my/id/eprint/69791/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.69791
record_format eprints
spelling my.uitm.ir.697912023-03-21T08:35:47Z https://ir.uitm.edu.my/id/eprint/69791/ Zainal & Din Construction Sdn. Bhd. / Mohammad Syabil Azmi Azmi, Mohammad Syabil Engineering as a profession. Engineers Management of engineering works The motive of the industrial training are mainly to let the student to gather some of experiences from real time job for students to further studies onto higher degree. By letting the students experienced such things, the students are able to apply the knowledge that they have learnt from attending classes for theories and able to applied those theories into real life situation. Apart from fulfilling the mandatory requirement for programme Diploma of Civil Engineering, students should be able to emphasize all of the knowledge that they learn academically and success in use the knowledge for real life application such as in the job perspective. From this report, I have state and clarify all of the activities about how the internship going right from the beginning until the end of the internship programme. As for information, the students should attend the internship programme duration which are 2 months or 8 weeks. The company that I have undergoes my internship, Zainal & Din are managing 2 main projects which is Taman Perumahan Soga Sutera and also school construction at Kulai district in Johor. The site that I have been assigned to is Taman Perumahan Soga Sutera located at Batu Pahat district in Johor. This report also will have a details about the company background, the things that I have learnt and experienced and even the organizational structure of the company. During the internship programme, there are many problems that that have been encountered but it will also come with solution to solve the issues. I am hoping that this report will be able to assure the readers and should be easily to understand about the civil engineering field in job perspective Faculty of Civil Engineering 2019 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/69791/1/69791.pdf Zainal & Din Construction Sdn. Bhd. / Mohammad Syabil Azmi. (2019) Industrial Training. Faculty of Civil Engineering, Universiti Teknologi MARA, Johor. (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Engineering as a profession. Engineers
Management of engineering works
spellingShingle Engineering as a profession. Engineers
Management of engineering works
Azmi, Mohammad Syabil
Zainal & Din Construction Sdn. Bhd. / Mohammad Syabil Azmi
description The motive of the industrial training are mainly to let the student to gather some of experiences from real time job for students to further studies onto higher degree. By letting the students experienced such things, the students are able to apply the knowledge that they have learnt from attending classes for theories and able to applied those theories into real life situation. Apart from fulfilling the mandatory requirement for programme Diploma of Civil Engineering, students should be able to emphasize all of the knowledge that they learn academically and success in use the knowledge for real life application such as in the job perspective. From this report, I have state and clarify all of the activities about how the internship going right from the beginning until the end of the internship programme. As for information, the students should attend the internship programme duration which are 2 months or 8 weeks. The company that I have undergoes my internship, Zainal & Din are managing 2 main projects which is Taman Perumahan Soga Sutera and also school construction at Kulai district in Johor. The site that I have been assigned to is Taman Perumahan Soga Sutera located at Batu Pahat district in Johor. This report also will have a details about the company background, the things that I have learnt and experienced and even the organizational structure of the company. During the internship programme, there are many problems that that have been encountered but it will also come with solution to solve the issues. I am hoping that this report will be able to assure the readers and should be easily to understand about the civil engineering field in job perspective
format Monograph
author Azmi, Mohammad Syabil
author_facet Azmi, Mohammad Syabil
author_sort Azmi, Mohammad Syabil
title Zainal & Din Construction Sdn. Bhd. / Mohammad Syabil Azmi
title_short Zainal & Din Construction Sdn. Bhd. / Mohammad Syabil Azmi
title_full Zainal & Din Construction Sdn. Bhd. / Mohammad Syabil Azmi
title_fullStr Zainal & Din Construction Sdn. Bhd. / Mohammad Syabil Azmi
title_full_unstemmed Zainal & Din Construction Sdn. Bhd. / Mohammad Syabil Azmi
title_sort zainal & din construction sdn. bhd. / mohammad syabil azmi
publisher Faculty of Civil Engineering
publishDate 2019
url https://ir.uitm.edu.my/id/eprint/69791/1/69791.pdf
https://ir.uitm.edu.my/id/eprint/69791/
_version_ 1761622302834819072
score 13.159267