Imbangan Juara Sdn. Bhd. / Nur Shamin Zulkepli
The Industrial Training programme enables students to go out and gain more practical knowledge of what they have been taught in university based skills Office work procedure covering introduction to work ethics and structural drawing was explained with the relevant signs and symbols representing var...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Faculty Of Civil Engineering
2019
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/69614/1/69614.pdf https://ir.uitm.edu.my/id/eprint/69614/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.69614 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.696142023-03-21T02:06:54Z https://ir.uitm.edu.my/id/eprint/69614/ Imbangan Juara Sdn. Bhd. / Nur Shamin Zulkepli Zulkepli, Nur Shamin Engineering as a profession. Engineers Management of engineering works The Industrial Training programme enables students to go out and gain more practical knowledge of what they have been taught in university based skills Office work procedure covering introduction to work ethics and structural drawing was explained with the relevant signs and symbols representing various items on such drawing. Site work for the period of training was undertaken at the Jalan Betik and Jalan Kulim. The projects consist of the installing pedestrian walk, and resurface and paved the road. This report contains four chapter which is my experience during 8 weeks been in my hosting company, Imbangan Juara Sdn. Bhd. The content of all chapters is broadly explained and it is constructed from the practical basis of the sites work and office work for 8 weeks. In the opening chapter, I explained about my company background, organizational structure, market strength and the projects those runs through company consultation. In this chapter, I put all record of history and futurity of my hosting company with its official address. The second chapter is explains my overall internship or weekly summary. This chapter is the main chapter of this report which I recorded all the work that I have been executing based on logbook. It gives a highlight of what I have been doing during my Industrial Training. Move to the third chapter, this chapter explained about the aspect and areas of the work. It is obvious that Industrial Training can improve working skills, and gain more experiences and knowledge. I also put several problems and its solution about the problem that I have been trough is construction and office work. The final and fourth chapter explained about the lesson learned such as skills developed and knowledge gained. I also explained about the limitations and recommendations on the project that our company runs Faculty Of Civil Engineering 2019 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/69614/1/69614.pdf Imbangan Juara Sdn. Bhd. / Nur Shamin Zulkepli. (2019) Industrial Training. Faculty Of Civil Engineering, Universiti Teknologi MARA, Johor. (Unpublished) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Engineering as a profession. Engineers Management of engineering works |
spellingShingle |
Engineering as a profession. Engineers Management of engineering works Zulkepli, Nur Shamin Imbangan Juara Sdn. Bhd. / Nur Shamin Zulkepli |
description |
The Industrial Training programme enables students to go out and gain more practical knowledge of what they have been taught in university based skills Office work procedure covering introduction to work ethics and structural drawing was explained with the relevant signs and symbols representing various items on such drawing. Site work for the period of training was undertaken at the Jalan Betik and Jalan Kulim. The projects consist of the installing pedestrian walk, and resurface and paved the road. This report contains four chapter which is my experience during 8 weeks been in my hosting company, Imbangan Juara Sdn. Bhd. The content of all chapters is broadly explained and it is constructed from the practical basis of the sites work and office work for 8 weeks. In the opening chapter, I explained about my company background, organizational structure, market strength and the projects those runs through company consultation. In this chapter, I put all record of history and futurity of my hosting company with its official address. The second chapter is explains my overall internship or weekly summary. This chapter is the main chapter of this report which I recorded all the work that I have been executing based on logbook. It gives a highlight of what I have been doing during my Industrial Training. Move to the third chapter, this chapter explained about the aspect and areas of the work. It is obvious that Industrial Training can improve working skills, and gain more experiences and knowledge. I also put several problems and its solution about the problem that I have been trough is construction and office work. The final and fourth chapter explained about the lesson learned such as skills
developed and knowledge gained. I also explained about the limitations and recommendations on the project that our company runs |
format |
Monograph |
author |
Zulkepli, Nur Shamin |
author_facet |
Zulkepli, Nur Shamin |
author_sort |
Zulkepli, Nur Shamin |
title |
Imbangan Juara Sdn. Bhd. / Nur Shamin Zulkepli |
title_short |
Imbangan Juara Sdn. Bhd. / Nur Shamin Zulkepli |
title_full |
Imbangan Juara Sdn. Bhd. / Nur Shamin Zulkepli |
title_fullStr |
Imbangan Juara Sdn. Bhd. / Nur Shamin Zulkepli |
title_full_unstemmed |
Imbangan Juara Sdn. Bhd. / Nur Shamin Zulkepli |
title_sort |
imbangan juara sdn. bhd. / nur shamin zulkepli |
publisher |
Faculty Of Civil Engineering |
publishDate |
2019 |
url |
https://ir.uitm.edu.my/id/eprint/69614/1/69614.pdf https://ir.uitm.edu.my/id/eprint/69614/ |
_version_ |
1761622301332209664 |
score |
13.209306 |