Facilities management readiness in Building Information Modelling (BIM) implementation in Malaysia / Nur Maisarah Che Zakaria

This study investigates the level of readiness for facilities management industry people to implementing Building Information Modelling (BIM) in their services. It presents contribution barriers and the BIM benefits that will be contributed to the success of BIM implementation in their industry. A m...

Full description

Saved in:
Bibliographic Details
Main Author: Che Zakaria, Nur Maisarah
Format: Thesis
Language:English
Published: 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/66508/1/66508.pdf
https://ir.uitm.edu.my/id/eprint/66508/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.66508
record_format eprints
spelling my.uitm.ir.665082022-11-23T02:21:44Z https://ir.uitm.edu.my/id/eprint/66508/ Facilities management readiness in Building Information Modelling (BIM) implementation in Malaysia / Nur Maisarah Che Zakaria Che Zakaria, Nur Maisarah TH Building construction Buildings: Construction with reference to use.Including public buildings, dwellings Building fittings and their installation This study investigates the level of readiness for facilities management industry people to implementing Building Information Modelling (BIM) in their services. It presents contribution barriers and the BIM benefits that will be contributed to the success of BIM implementation in their industry. A mixed-method approach was used to identify the benefits and barriers of BIM implementation by obtaining the information from literature mapping, conceptual framing, and collection of data by distributing the survey questionnaire (quantitative) through google form. In the literature review phase, ten (10) benefits were identified as the reason why facilities management should implement BIM technologies into their services such as better space management, FM services became faster, efficient, and effective, safety risk can be reducing and many more. There were also five (5) barriers to implementing BIM that were identified thru some research and the questionnaire survey that will be responded to by the facilities management people will be answering either the barriers stated are what happens to them or not. An overall, the findings of this study will tell if the facilities management industry were ready to implementing BIM in their services or otherwise. 2021 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/66508/1/66508.pdf Facilities management readiness in Building Information Modelling (BIM) implementation in Malaysia / Nur Maisarah Che Zakaria. (2021) Degree thesis, thesis, Universiti Teknologi MARA, Perak. <http://terminalib.uitm.edu.my/66508.pdf>
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Buildings: Construction with reference to use.Including public buildings, dwellings
Building fittings and their installation
spellingShingle TH Building construction
Buildings: Construction with reference to use.Including public buildings, dwellings
Building fittings and their installation
Che Zakaria, Nur Maisarah
Facilities management readiness in Building Information Modelling (BIM) implementation in Malaysia / Nur Maisarah Che Zakaria
description This study investigates the level of readiness for facilities management industry people to implementing Building Information Modelling (BIM) in their services. It presents contribution barriers and the BIM benefits that will be contributed to the success of BIM implementation in their industry. A mixed-method approach was used to identify the benefits and barriers of BIM implementation by obtaining the information from literature mapping, conceptual framing, and collection of data by distributing the survey questionnaire (quantitative) through google form. In the literature review phase, ten (10) benefits were identified as the reason why facilities management should implement BIM technologies into their services such as better space management, FM services became faster, efficient, and effective, safety risk can be reducing and many more. There were also five (5) barriers to implementing BIM that were identified thru some research and the questionnaire survey that will be responded to by the facilities management people will be answering either the barriers stated are what happens to them or not. An overall, the findings of this study will tell if the facilities management industry were ready to implementing BIM in their services or otherwise.
format Thesis
author Che Zakaria, Nur Maisarah
author_facet Che Zakaria, Nur Maisarah
author_sort Che Zakaria, Nur Maisarah
title Facilities management readiness in Building Information Modelling (BIM) implementation in Malaysia / Nur Maisarah Che Zakaria
title_short Facilities management readiness in Building Information Modelling (BIM) implementation in Malaysia / Nur Maisarah Che Zakaria
title_full Facilities management readiness in Building Information Modelling (BIM) implementation in Malaysia / Nur Maisarah Che Zakaria
title_fullStr Facilities management readiness in Building Information Modelling (BIM) implementation in Malaysia / Nur Maisarah Che Zakaria
title_full_unstemmed Facilities management readiness in Building Information Modelling (BIM) implementation in Malaysia / Nur Maisarah Che Zakaria
title_sort facilities management readiness in building information modelling (bim) implementation in malaysia / nur maisarah che zakaria
publishDate 2021
url https://ir.uitm.edu.my/id/eprint/66508/1/66508.pdf
https://ir.uitm.edu.my/id/eprint/66508/
_version_ 1751539894085222400
score 13.211869