Pertinent internal and external issues in industrialised building system (IBS) construction business in Malaysia / Vivian Anne Thomas Tarang ... [et al.]
Industrialised Building System (IBS) construction business has emerged as one of the potential business ventures as the Malaysian construction industry is in a constant need to shift from conventional method of construction to IBS adoption aligning to Construction 4.0 Strategic Plan 2021-2025 and Th...
Saved in:
Main Authors: | Thomas Tarang, Vivian Anne, Mohammad, Mohammad Fadhil, Nizam Akbar, Anis Rosniza, Mohamed, Mohamed Rizal |
---|---|
Format: | Article |
Language: | English |
Published: |
UiTM Press
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/65593/1/65593.pdf https://ir.uitm.edu.my/id/eprint/65593/ https://bej.uitm.edu.my/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Flexibility supply chain in Industrialised Building System (IBS)
by: Kassim, Umar, et al.
Published: (2013) -
The Current State of the Implementation of Mechanisation and Automation (M&A) in Industrialised Building System (IBS) in Construction Industry
by: Siti Syariazulfa Kamaruddin, Kamaruddin, et al.
Published: (2021) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013) -
Energy Consumption Assessment on Industrialised Building System (IBS)
by: Nadia, Zaini, et al.
Published: (2020)