Method statement of installation precast concrete column and beam at Mukim Seriab, Perlis / Nur Fitrah Khalid

This report is content all about the information about my case study through practical training under company Pens Holdings Sdn. Bhd during the four months of practical training. The topic that I have choose to complete my practical training is method statement of installation precast column and bea...

Full description

Saved in:
Bibliographic Details
Main Author: Khalid, Nur Fitrah
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2018
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/65581/1/65581.pdf
https://ir.uitm.edu.my/id/eprint/65581/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.65581
record_format eprints
spelling my.uitm.ir.655812022-09-08T03:15:56Z https://ir.uitm.edu.my/id/eprint/65581/ Method statement of installation precast concrete column and beam at Mukim Seriab, Perlis / Nur Fitrah Khalid Khalid, Nur Fitrah TH Building construction Building fittings and their installation Architectural engineering. Structural engineering of buildings This report is content all about the information about my case study through practical training under company Pens Holdings Sdn. Bhd during the four months of practical training. The topic that I have choose to complete my practical training is method statement of installation precast column and beam because the stage of construction project in undergoing is the superstructure work. This report has a 5 chapter which included all information about the company, general information about case study, information about case study which is focus on specific topic that I have choose, and also problems and recommendation that have been analyzed during practical training. The first chapter in this report is detail of information of the company and the organization that owned by company that I choose to undergo the practical training. It also contain about the scope of work about this company, objective, mission and vision , location and suppliers that involved with the company Pens Holdings Sdn Bhd. The second chapter give out information about the literature review based on my case study. All the general information and overview about the topic that I have choose is included in this chapter. It content about the definition, types and etc. The third chapter list out all the information about my case study that have get from my observation and learning with my real experience at the construction site that I have involved under company Pens Holdings Sdn Bhd. It content about the specific information that I get through practical training such as method of construction, step by step what should do with orderly regarding my topic of case study. Forth chapter is the problems and recommendation that I have analyze during the completion of the practical training report. It all about focusing and identifying the problem that occurs regarding my case study at site construction. Some of the problem might be minor and some of them could be major, sometimes the minor problem that occurs are not be taken any action. The last chapter in this report is the conclusion of the whole chapter which is the summary of every chapter in this report. Universiti Teknologi MARA, Perak 2018 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/65581/1/65581.pdf Method statement of installation precast concrete column and beam at Mukim Seriab, Perlis / Nur Fitrah Khalid. (2018) Industrial Training. Universiti Teknologi MARA, Perak. <http://terminalib.uitm.edu.my/65581.pdf>
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Building fittings and their installation
Architectural engineering. Structural engineering of buildings
spellingShingle TH Building construction
Building fittings and their installation
Architectural engineering. Structural engineering of buildings
Khalid, Nur Fitrah
Method statement of installation precast concrete column and beam at Mukim Seriab, Perlis / Nur Fitrah Khalid
description This report is content all about the information about my case study through practical training under company Pens Holdings Sdn. Bhd during the four months of practical training. The topic that I have choose to complete my practical training is method statement of installation precast column and beam because the stage of construction project in undergoing is the superstructure work. This report has a 5 chapter which included all information about the company, general information about case study, information about case study which is focus on specific topic that I have choose, and also problems and recommendation that have been analyzed during practical training. The first chapter in this report is detail of information of the company and the organization that owned by company that I choose to undergo the practical training. It also contain about the scope of work about this company, objective, mission and vision , location and suppliers that involved with the company Pens Holdings Sdn Bhd. The second chapter give out information about the literature review based on my case study. All the general information and overview about the topic that I have choose is included in this chapter. It content about the definition, types and etc. The third chapter list out all the information about my case study that have get from my observation and learning with my real experience at the construction site that I have involved under company Pens Holdings Sdn Bhd. It content about the specific information that I get through practical training such as method of construction, step by step what should do with orderly regarding my topic of case study. Forth chapter is the problems and recommendation that I have analyze during the completion of the practical training report. It all about focusing and identifying the problem that occurs regarding my case study at site construction. Some of the problem might be minor and some of them could be major, sometimes the minor problem that occurs are not be taken any action. The last chapter in this report is the conclusion of the whole chapter which is the summary of every chapter in this report.
format Monograph
author Khalid, Nur Fitrah
author_facet Khalid, Nur Fitrah
author_sort Khalid, Nur Fitrah
title Method statement of installation precast concrete column and beam at Mukim Seriab, Perlis / Nur Fitrah Khalid
title_short Method statement of installation precast concrete column and beam at Mukim Seriab, Perlis / Nur Fitrah Khalid
title_full Method statement of installation precast concrete column and beam at Mukim Seriab, Perlis / Nur Fitrah Khalid
title_fullStr Method statement of installation precast concrete column and beam at Mukim Seriab, Perlis / Nur Fitrah Khalid
title_full_unstemmed Method statement of installation precast concrete column and beam at Mukim Seriab, Perlis / Nur Fitrah Khalid
title_sort method statement of installation precast concrete column and beam at mukim seriab, perlis / nur fitrah khalid
publisher Universiti Teknologi MARA, Perak
publishDate 2018
url https://ir.uitm.edu.my/id/eprint/65581/1/65581.pdf
https://ir.uitm.edu.my/id/eprint/65581/
_version_ 1744357239651565568
score 13.187197