The work flow of building inspection at training nurse hostel: Block E / Nur Farhanah Ma'zin

Practical training at the Jabatan Kerja Raya Muar Johor. The JKR Muar have a few department which is building department, road department, facilities department, quantities survey and administration. This company is function is to conduct the construction project, monitor the federal road and mainta...

Full description

Saved in:
Bibliographic Details
Main Author: Ma'zin, Nur Farhanah
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2018
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/65574/1/65574.pdf
https://ir.uitm.edu.my/id/eprint/65574/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Practical training at the Jabatan Kerja Raya Muar Johor. The JKR Muar have a few department which is building department, road department, facilities department, quantities survey and administration. This company is function is to conduct the construction project, monitor the federal road and maintain the building. This also learn about the general inspection on the building that used by the building surveyor. On the inspection there are learn a few defect that on the building such as the crack on the wall, and concrete spalling. From this, its can identify the pattern, and possible causes of the defect. The case study area is located at Training Nurse Hostel (Block E), Sultanah Fatimah Specialist Hospital. The objective of the inspection on the building is to identify the causes of defect on building structural, to inspect and evaluate the defect on building structural, and the proposing the repair structure to be submitted by JKR Muar and JKR Johor. This learn about the flow chart for the building inspection on the Training Nurse Hostel (Block E). The inspection is involved the professional team such as Geotechnics Engineering Department, and Civil and Structure Engineering Department.