Grand Kampar Hotel Kampar / Amirul Ammar Huzaimi ... [et al.]
Final Integrated Project consist of Ten (10) chapter. The case study is Grand Kampar Hotel (GKH). In first chapter, it story about the building information include the building background, the building facilities and utilities and location of the building. In second chapter, there are many subject a...
Saved in:
Main Authors: | Huzaimi, Amirul Ammar, Muhamad Zaidi, Muhamad Haikal, Azami, Muhammad Aiman, Mohamed, Nur Anis Asneeda, Waruzi, Wan Nurshazwani |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/65454/1/65454.pdf https://ir.uitm.edu.my/id/eprint/65454/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Process of building hand over / Amirul Ammar Huzaimi
by: Huzaimi, Amirul Ammar
Published: (2017) -
Facilities management in hypermarket / Syamsul Ammar Yahya
by: Yahya, Syamsul Ammar
Published: (2006) -
The maintenance on salinity effect on reinforcement concrete structure at coastal area / Harmidzy Muhamad Har
by: Muhamad Har, Harmidzy
Published: (2014) -
The problem of maintenance management in government building / Muhamad Raqib Shaari
by: Shaari, Muhamad Raqib
Published: (2009) -
Menara Majlis Perbandaran Seberang Perai, Pulau Pinang / Nur Adha Radhiah Ab Llah ... [et al.]
by: Ab Llah, Nur Adha Radhiah, et al.
Published: (2013)