Appraising the need to study on the format of bills of quantities / Shamsulhadi Bandi, Hamimah Adnan and Fadhlin Abdullah

There are concerns reported on various aspects of Bills of Quantities (BQ). This includes concerns over the BQ format that helps to organise and convey critical information to parties in construction. Although concerns over the BQ format are mentioned in various literature, these however have been h...

Full description

Saved in:
Bibliographic Details
Main Authors: Bandi, Shamsulhadi, Adnan, Hamimah, Abdullah, Fadhlin
Format: Article
Language:English
Published: Faculty of Architecture, Planning and Surveying 2016
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/65215/1/65215.pdf
https://ir.uitm.edu.my/id/eprint/65215/
https://bej.uitm.edu.my/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.65215
record_format eprints
spelling my.uitm.ir.652152022-08-11T04:38:13Z https://ir.uitm.edu.my/id/eprint/65215/ Appraising the need to study on the format of bills of quantities / Shamsulhadi Bandi, Hamimah Adnan and Fadhlin Abdullah Bandi, Shamsulhadi Adnan, Hamimah Abdullah, Fadhlin Estimates. Measurements. Quantities and cost Contractors There are concerns reported on various aspects of Bills of Quantities (BQ). This includes concerns over the BQ format that helps to organise and convey critical information to parties in construction. Although concerns over the BQ format are mentioned in various literature, these however have been highlighted in fragment. Consequently, there is limited opportunity to demonstrate its enormity, in justifying a study to be conducted. Therefore, by reviewing, analysing and synthesising various issues concerning the uses of BQ, this paper seeks to provide theoretical justification on whether a study to re-examine the BQ format is impending. In adopting to the issues-driven-approach, two objectives were outlined: (1) to critically review the literatures to identify the issues on the application of the BQ; and (2) to synthesise the outcome of the review process to identify relevant research focus. The study which had essentially employed an extensive literature review had synthesised three categories of issues related to: (1) information; (2) format; and (3) working methods. It was found that issues concerning BQ information have been mentioned more frequently in the synthesis. Following the approach, it implies that concerns over BQ format is not considered impending. Rather, a study to re-examine BQ information is much needed and may contribute by offering substantial improvement to the uses of BQ. Faculty of Architecture, Planning and Surveying 2016-07 Article PeerReviewed text en https://ir.uitm.edu.my/id/eprint/65215/1/65215.pdf Appraising the need to study on the format of bills of quantities / Shamsulhadi Bandi, Hamimah Adnan and Fadhlin Abdullah. (2016) Built Environment Journal, 13 (2): 4. pp. 37-50. ISSN 1675-5099 https://bej.uitm.edu.my/
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Estimates. Measurements. Quantities and cost
Contractors
spellingShingle Estimates. Measurements. Quantities and cost
Contractors
Bandi, Shamsulhadi
Adnan, Hamimah
Abdullah, Fadhlin
Appraising the need to study on the format of bills of quantities / Shamsulhadi Bandi, Hamimah Adnan and Fadhlin Abdullah
description There are concerns reported on various aspects of Bills of Quantities (BQ). This includes concerns over the BQ format that helps to organise and convey critical information to parties in construction. Although concerns over the BQ format are mentioned in various literature, these however have been highlighted in fragment. Consequently, there is limited opportunity to demonstrate its enormity, in justifying a study to be conducted. Therefore, by reviewing, analysing and synthesising various issues concerning the uses of BQ, this paper seeks to provide theoretical justification on whether a study to re-examine the BQ format is impending. In adopting to the issues-driven-approach, two objectives were outlined: (1) to critically review the literatures to identify the issues on the application of the BQ; and (2) to synthesise the outcome of the review process to identify relevant research focus. The study which had essentially employed an extensive literature review had synthesised three categories of issues related to: (1) information; (2) format; and (3) working methods. It was found that issues concerning BQ information have been mentioned more frequently in the synthesis. Following the approach, it implies that concerns over BQ format is not considered impending. Rather, a study to re-examine BQ information is much needed and may contribute by offering substantial improvement to the uses of BQ.
format Article
author Bandi, Shamsulhadi
Adnan, Hamimah
Abdullah, Fadhlin
author_facet Bandi, Shamsulhadi
Adnan, Hamimah
Abdullah, Fadhlin
author_sort Bandi, Shamsulhadi
title Appraising the need to study on the format of bills of quantities / Shamsulhadi Bandi, Hamimah Adnan and Fadhlin Abdullah
title_short Appraising the need to study on the format of bills of quantities / Shamsulhadi Bandi, Hamimah Adnan and Fadhlin Abdullah
title_full Appraising the need to study on the format of bills of quantities / Shamsulhadi Bandi, Hamimah Adnan and Fadhlin Abdullah
title_fullStr Appraising the need to study on the format of bills of quantities / Shamsulhadi Bandi, Hamimah Adnan and Fadhlin Abdullah
title_full_unstemmed Appraising the need to study on the format of bills of quantities / Shamsulhadi Bandi, Hamimah Adnan and Fadhlin Abdullah
title_sort appraising the need to study on the format of bills of quantities / shamsulhadi bandi, hamimah adnan and fadhlin abdullah
publisher Faculty of Architecture, Planning and Surveying
publishDate 2016
url https://ir.uitm.edu.my/id/eprint/65215/1/65215.pdf
https://ir.uitm.edu.my/id/eprint/65215/
https://bej.uitm.edu.my/
_version_ 1743110433240252416
score 13.160551