Perbadanan Nasional Berhad Tower 7 Avenue 7 Bangsar South Kuala Lumpur / Mohd Alif Che Azmi ... [et al.]
First chapter will be discussed about the detail of the case study backgrounds, the second chapter will be discussed about the organization for building and also the maintenance organization and the chapter three will be discussed about the maintenance policy and planning for the building. Chapter f...
Saved in:
Main Authors: | Che Azmi, Mohd Alif, Husin, Ezzat Adhaa, Zamri, Muhammad Danial, Shihabuddin, Muhammad Faiz Fakhruddin, Abdul Rahman, Raden Heedhir, Saiddin, Nor Hafizah |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/64522/1/64522.pdf https://ir.uitm.edu.my/id/eprint/64522/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Tiles installation / Muhammad Alif Syakir Rosdi
by: Rosdi, Muhammad Alif Syakir
Published: (2022) -
Cadangan merekabentuk ruang dalaman Harley Davidson Cafe & Bistro di Lot 129 , Jalan Maarof, 56100 Bangsar, Kuala Lumpur. / Suhaslizan Sukor
by: Sukor, Suhaslizan
Published: (2006) -
Proposed interior new design of theme café at No.32, 32A & 32B, Jalan Plumbum Q7/Q, Seksyen 7, 40000 Shah Alam, Selangor Darul Ehsan for Mat Salai Sdn Bhd / Mohamad Haniff Johar
by: Johar, Mohamad Haniff
Published: (2012) -
The relation between maintenance and safety of tower crane on construction site / Nik Khairunnisa Nik Pa
by: Nik Pa, Nik Khairunnisa
Published: (2008) -
Wall installation (Caspia 2 – Puncak Iskandar) / Mohd Alif Aiman Azemi
by: Azemi, Mohd Alif Aiman
Published: (2016)