Maintenance works of air conditioning at Faculty of Office Management (FPP) Universiti Teknologi MARA (Perak) / Muhammad Khairulazman Khadzali

Maintenance should be considered as an integral part of the project during all phases of the design and preferably during the preparation of the brief. The management of building services maintenance, the reason for such maintenance and its implementation need to be clearly defined. The main contrac...

Full description

Saved in:
Bibliographic Details
Main Author: Khadzali, Muhammad Khairulazman
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2013
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/63882/1/63882.pdf
https://ir.uitm.edu.my/id/eprint/63882/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.63882
record_format eprints
spelling my.uitm.ir.638822022-09-06T04:06:46Z https://ir.uitm.edu.my/id/eprint/63882/ Maintenance works of air conditioning at Faculty of Office Management (FPP) Universiti Teknologi MARA (Perak) / Muhammad Khairulazman Khadzali Khadzali, Muhammad Khairulazman TH Building construction Maintenance and repair Heating and ventilation. Air conditioning Maintenance should be considered as an integral part of the project during all phases of the design and preferably during the preparation of the brief. The management of building services maintenance, the reason for such maintenance and its implementation need to be clearly defined. The main contractor should provide the following information: Records drawings showing locations and depths of all external services installed by all contractors and public utilities Details and locations of all access manholes, valves, etc. for the services Details of all tests carried out on external service mains and all statutory approval. The services sub-contractor should provide the following record information: Specially prepared drawings for all piped and wired services, showing all the services installed will full annotations. Updated ductwork, wiring and control panel drawings showing the work as fitted. Updated schedules of all equipment installed, with full means of identifications by site label numbers, component serial number , test certificates, dated installed etc. This Academic building blocks using split unit air-conditioning system Split unit is a separate air conditioning system units evaporation and condensation. The unit is divided into two parts, units and outdoor units. Unit consists of the evaporator and evaporator fan. The outdoor unit consists of a condenser, piping, condenser fan and other add-ons installed locally. Both inside and outside the unit installed separately. Universiti Teknologi MARA, Perak 2013 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/63882/1/63882.pdf Maintenance works of air conditioning at Faculty of Office Management (FPP) Universiti Teknologi MARA (Perak) / Muhammad Khairulazman Khadzali. (2013) Industrial Training. Universiti Teknologi MARA, Perak. <http://terminalib.uitm.edu.my/63882.pdf>
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Maintenance and repair
Heating and ventilation. Air conditioning
spellingShingle TH Building construction
Maintenance and repair
Heating and ventilation. Air conditioning
Khadzali, Muhammad Khairulazman
Maintenance works of air conditioning at Faculty of Office Management (FPP) Universiti Teknologi MARA (Perak) / Muhammad Khairulazman Khadzali
description Maintenance should be considered as an integral part of the project during all phases of the design and preferably during the preparation of the brief. The management of building services maintenance, the reason for such maintenance and its implementation need to be clearly defined. The main contractor should provide the following information: Records drawings showing locations and depths of all external services installed by all contractors and public utilities Details and locations of all access manholes, valves, etc. for the services Details of all tests carried out on external service mains and all statutory approval. The services sub-contractor should provide the following record information: Specially prepared drawings for all piped and wired services, showing all the services installed will full annotations. Updated ductwork, wiring and control panel drawings showing the work as fitted. Updated schedules of all equipment installed, with full means of identifications by site label numbers, component serial number , test certificates, dated installed etc. This Academic building blocks using split unit air-conditioning system Split unit is a separate air conditioning system units evaporation and condensation. The unit is divided into two parts, units and outdoor units. Unit consists of the evaporator and evaporator fan. The outdoor unit consists of a condenser, piping, condenser fan and other add-ons installed locally. Both inside and outside the unit installed separately.
format Monograph
author Khadzali, Muhammad Khairulazman
author_facet Khadzali, Muhammad Khairulazman
author_sort Khadzali, Muhammad Khairulazman
title Maintenance works of air conditioning at Faculty of Office Management (FPP) Universiti Teknologi MARA (Perak) / Muhammad Khairulazman Khadzali
title_short Maintenance works of air conditioning at Faculty of Office Management (FPP) Universiti Teknologi MARA (Perak) / Muhammad Khairulazman Khadzali
title_full Maintenance works of air conditioning at Faculty of Office Management (FPP) Universiti Teknologi MARA (Perak) / Muhammad Khairulazman Khadzali
title_fullStr Maintenance works of air conditioning at Faculty of Office Management (FPP) Universiti Teknologi MARA (Perak) / Muhammad Khairulazman Khadzali
title_full_unstemmed Maintenance works of air conditioning at Faculty of Office Management (FPP) Universiti Teknologi MARA (Perak) / Muhammad Khairulazman Khadzali
title_sort maintenance works of air conditioning at faculty of office management (fpp) universiti teknologi mara (perak) / muhammad khairulazman khadzali
publisher Universiti Teknologi MARA, Perak
publishDate 2013
url https://ir.uitm.edu.my/id/eprint/63882/1/63882.pdf
https://ir.uitm.edu.my/id/eprint/63882/
_version_ 1744357217789804544
score 13.209306