Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid

Overall, this report is about deep foundation used at Infant Jesus Convent School to build new block of building consisting on 3 storey canteen and office. The foundation is in category of deep foundation because it use piling for the foundation. The space provided by the school is not wide enough t...

Full description

Saved in:
Bibliographic Details
Main Author: Majid, Mohamad Nur Arif
Format: Student Project
Language:English
Published: 2013
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/63839/1/63839.pdf
https://ir.uitm.edu.my/id/eprint/63839/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Overall, this report is about deep foundation used at Infant Jesus Convent School to build new block of building consisting on 3 storey canteen and office. The foundation is in category of deep foundation because it use piling for the foundation. The space provided by the school is not wide enough to support three storey building at the site. The project was started from early of January this year (2013) and being targeted to finish the piling works by the end of 2013. Infant Jesus Convent School was placed at the middle of city. And the site provided was located between school buildings. Hydraulic Piling is chosen for the method of piling. Even though this method is high in cost, but the method is not produce noise pollution. The method takes more time than the other piling method, but it works efficiently and environment-friendly.