To reduce maximum demand during peak hours and to estimate the future loads of ITM / Norshahidah Mohd Nordin and Jaslina Zakaria
This project present how, to analyse and to reduce the maximum demand during peak hours and also to estimate the future load in Mara Institute of Technology. As the content indicates, the readers is given a brief introduction on how to analyse load distribution in ITM. First major substation were ch...
Saved in:
Main Authors: | , |
---|---|
Format: | Student Project |
Language: | English |
Online Access: | https://ir.uitm.edu.my/id/eprint/62553/1/62553.pdf https://ir.uitm.edu.my/id/eprint/62553/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This project present how, to analyse and to reduce the maximum demand during peak hours and also to estimate the future load in Mara Institute of Technology. As the content indicates, the readers is given a brief introduction on how to analyse load distribution in ITM. First major substation were choosen, graph were then plotted due to voltage and current taken. All graph plotted by using lotus 123. From Graph plotted the load analysis distributed were analysed. Estimation for future load were made based on floor area using certain factors that provided by J.K.R Standard. From this estimation, the transformer rating also could be estimated by using appropriate diversity factor. Suggestions and problems also taken into consideration. Lastly, we hope that other student will continue this analysis for future used with better information and data. |
---|