Flood mitigation of Kuala Lumpur: a technical review / Abdul Aziz Ahmad
The Kuala Lumpur Flood Mitigation Project was implemented after the flood event of 1971 which caused a great destruction to the city of Kuala Lumpur. This project comprises of constructing new dams, that is Batu and Gombak Dams; raising of Klang Gates Dam, which was.completed in 1980; river improvem...
Saved in:
Main Author: | Ahmad, Abdul Aziz |
---|---|
Format: | Student Project |
Language: | English |
Published: |
1983
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/62500/1/62500.pdf https://ir.uitm.edu.my/id/eprint/62500/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Flood mitigation at Sungai Batu Asah, Langkawi / Shaharuddin Semaun
by: Semaun, Shaharuddin
Published: (1997) -
Cost-benefit analysis for optimum return of flood control mitigation / Nor Azliza Akbar, Amalina Amirah Abu Bakar and Siti Isma Hani Ismail
by: Abu Bakar, Amalina Amirah
Published: (2012) -
Bi-objective location allocation model for flood relief centres: a case study in Kuala Kuantan / Noridayu Mah Hashim
by: Mah Hashim, Noridayu
Published: (2022) -
Flood detection system / Airulhafzan Johari
by: Johari, Airulhafzan
Published: (2004) -
Revision of regional flood frequency analysis and the development of design flood estimation software for peninsular Malaysia / Wardah tahir and Zaidah Ibrahim
by: Tahir, Wardah, et al.
Published: (2001)