Civil works and hydraulic construction of small hydro power plant / Khairuddin Yunus and Zaini Jalil
Malaysia has gone to great extend in developing mini hydro projects in rural areas. The design procedures and manuals are yet to be produced. Most of the design are still based on procedures which are not yet standardised. The aims of this project will be to review the procedures involved into a sta...
Saved in:
Main Authors: | , |
---|---|
Format: | Student Project |
Language: | English |
Published: |
1987
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/62359/1/62359.pdf https://ir.uitm.edu.my/id/eprint/62359/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Malaysia has gone to great extend in developing mini hydro projects in rural areas. The design procedures and manuals are yet to be produced. Most of the design are still based on procedures which are not yet standardised. The aims of this project will be to review the procedures involved into a standard design manual. Emphasis shall be made on Civil Works and Hydraulic Construction of Small Hydro Power Plant. The project will include existing Malaysian practices as well as design procedures and manuals developed by other countries with the cooperation of the National Electricity Board of Malaysia. An attempt shall be made to show step by step of the procedures involve. |
---|