Civil works and hydraulic construction of small hydro power plant / Khairuddin Yunus and Zaini Jalil

Malaysia has gone to great extend in developing mini hydro projects in rural areas. The design procedures and manuals are yet to be produced. Most of the design are still based on procedures which are not yet standardised. The aims of this project will be to review the procedures involved into a sta...

Full description

Saved in:
Bibliographic Details
Main Authors: Yunus, Khairuddin, Jalil, Zaini
Format: Student Project
Language:English
Published: 1987
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/62359/1/62359.pdf
https://ir.uitm.edu.my/id/eprint/62359/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Malaysia has gone to great extend in developing mini hydro projects in rural areas. The design procedures and manuals are yet to be produced. Most of the design are still based on procedures which are not yet standardised. The aims of this project will be to review the procedures involved into a standard design manual. Emphasis shall be made on Civil Works and Hydraulic Construction of Small Hydro Power Plant. The project will include existing Malaysian practices as well as design procedures and manuals developed by other countries with the cooperation of the National Electricity Board of Malaysia. An attempt shall be made to show step by step of the procedures involve.