Building condition survey report case study at Kuala Krai district / Siti Nur Hasibah Azlani

Practical training or also known as industrial training outside the institution is a condition that all student need to get through. Some other course, their industrial training is on semester 4 or semester 5. After that they need to continue their study as usual. But for course building surveying,...

Full description

Saved in:
Bibliographic Details
Main Author: Azlani, Siti Nur Hasibah
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/61639/1/61639.pdf
https://ir.uitm.edu.my/id/eprint/61639/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.61639
record_format eprints
spelling my.uitm.ir.616392022-06-16T01:28:10Z https://ir.uitm.edu.my/id/eprint/61639/ Building condition survey report case study at Kuala Krai district / Siti Nur Hasibah Azlani Azlani, Siti Nur Hasibah TH Building construction Practical training or also known as industrial training outside the institution is a condition that all student need to get through. Some other course, their industrial training is on semester 4 or semester 5. After that they need to continue their study as usual. But for course building surveying, the industrial training is for the last semester. The procedure of applying the place of training is before the second last semester had end. So the student needs to confirm their place of industrial training as soon as possible to avoid any unwanted things happen. The company for industrial training must be related with the course. So the student can learn more and get more experience about the course. Also learn and look how the surveyors work. During the training, the student must write a simple written report in log book that was given by the lecturer. What are the student do every day must be write in the log book by write and also picture for the evidence. The students also need to do the report during the training. The title of the report must be the project that the company is currently doing. The report must be submit at the end of the industrial training. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/61639/1/61639.pdf Building condition survey report case study at Kuala Krai district / Siti Nur Hasibah Azlani. (2015) [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Azlani, Siti Nur Hasibah
Building condition survey report case study at Kuala Krai district / Siti Nur Hasibah Azlani
description Practical training or also known as industrial training outside the institution is a condition that all student need to get through. Some other course, their industrial training is on semester 4 or semester 5. After that they need to continue their study as usual. But for course building surveying, the industrial training is for the last semester. The procedure of applying the place of training is before the second last semester had end. So the student needs to confirm their place of industrial training as soon as possible to avoid any unwanted things happen. The company for industrial training must be related with the course. So the student can learn more and get more experience about the course. Also learn and look how the surveyors work. During the training, the student must write a simple written report in log book that was given by the lecturer. What are the student do every day must be write in the log book by write and also picture for the evidence. The students also need to do the report during the training. The title of the report must be the project that the company is currently doing. The report must be submit at the end of the industrial training.
format Student Project
author Azlani, Siti Nur Hasibah
author_facet Azlani, Siti Nur Hasibah
author_sort Azlani, Siti Nur Hasibah
title Building condition survey report case study at Kuala Krai district / Siti Nur Hasibah Azlani
title_short Building condition survey report case study at Kuala Krai district / Siti Nur Hasibah Azlani
title_full Building condition survey report case study at Kuala Krai district / Siti Nur Hasibah Azlani
title_fullStr Building condition survey report case study at Kuala Krai district / Siti Nur Hasibah Azlani
title_full_unstemmed Building condition survey report case study at Kuala Krai district / Siti Nur Hasibah Azlani
title_sort building condition survey report case study at kuala krai district / siti nur hasibah azlani
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/61639/1/61639.pdf
https://ir.uitm.edu.my/id/eprint/61639/
_version_ 1736837354523459584
score 13.209306