Upgrading works for JKR building case study: JKR Besut, Kuala Terengganu / Muhamad Iqbal Zailan
The practical training is compulsory for all students to be prepared before turning into a real work, the practical training is mandatory requirement for a student to complete a semester before getting recognition diploma or degree at university centers. Practical training give high impact to the st...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/61532/1/61532.pdf https://ir.uitm.edu.my/id/eprint/61532/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.61532 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.615322022-06-15T07:02:16Z https://ir.uitm.edu.my/id/eprint/61532/ Upgrading works for JKR building case study: JKR Besut, Kuala Terengganu / Muhamad Iqbal Zailan Zailan, Muhamad Iqbal TH Building construction The practical training is compulsory for all students to be prepared before turning into a real work, the practical training is mandatory requirement for a student to complete a semester before getting recognition diploma or degree at university centers. Practical training give high impact to the student how is feels working in real duty and learn something to increase knowledge and extensive experience in each course. On 2015, Practical training starts a long the 10 weeks commencing on 1 May 2015 to 15Oct 2015. For the final semester practical, I have found and applied a place in the company DELIMA MAYA (DM) and SAPURA KENCANA which is manages the development project and oil and gas project. During the training takes place in this company, I was given the opportunity to follow the engineers involved in the site to look more closely at how the ongoing development process, it have extended my experience on to take the little of the job after graduation. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/61532/1/61532.pdf Upgrading works for JKR building case study: JKR Besut, Kuala Terengganu / Muhamad Iqbal Zailan. (2015) [Student Project] |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction |
spellingShingle |
TH Building construction Zailan, Muhamad Iqbal Upgrading works for JKR building case study: JKR Besut, Kuala Terengganu / Muhamad Iqbal Zailan |
description |
The practical training is compulsory for all students to be prepared before turning into a real work, the practical training is mandatory requirement for a student to complete a semester before getting recognition diploma or degree at university centers. Practical training give high impact to the student how is feels working in real duty and learn something to increase knowledge and extensive experience in each course. On 2015, Practical training starts a long the 10 weeks commencing on 1 May 2015 to 15Oct 2015. For the final semester practical, I have found and applied a place in the company DELIMA MAYA (DM) and SAPURA KENCANA which is manages the development project and oil and gas project. During the training takes place in this company, I was given the opportunity to follow the engineers involved in the site to look more closely at how the ongoing development process, it have extended my experience on to take the little of the job after graduation. |
format |
Student Project |
author |
Zailan, Muhamad Iqbal |
author_facet |
Zailan, Muhamad Iqbal |
author_sort |
Zailan, Muhamad Iqbal |
title |
Upgrading works for JKR building case study: JKR Besut, Kuala Terengganu / Muhamad Iqbal Zailan |
title_short |
Upgrading works for JKR building case study: JKR Besut, Kuala Terengganu / Muhamad Iqbal Zailan |
title_full |
Upgrading works for JKR building case study: JKR Besut, Kuala Terengganu / Muhamad Iqbal Zailan |
title_fullStr |
Upgrading works for JKR building case study: JKR Besut, Kuala Terengganu / Muhamad Iqbal Zailan |
title_full_unstemmed |
Upgrading works for JKR building case study: JKR Besut, Kuala Terengganu / Muhamad Iqbal Zailan |
title_sort |
upgrading works for jkr building case study: jkr besut, kuala terengganu / muhamad iqbal zailan |
publishDate |
2015 |
url |
https://ir.uitm.edu.my/id/eprint/61532/1/61532.pdf https://ir.uitm.edu.my/id/eprint/61532/ |
_version_ |
1736837343681183744 |
score |
13.188404 |