Inspection report procedure in Hotel Perdana / Muhammad Afiq Aiman Mohd Ghazali

Generally, this report is a study on Procedure of Inspection Report that applied at Hotel Perdana Kota Baharu. This study that I’ve made is based on Previous Inspection Report that has been prepared by consultant. This report is divided into a few sections or chapter which is Company Background, Lit...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Ghazali, Muhammad Afiq Aiman
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/61506/1/61506.pdf
https://ir.uitm.edu.my/id/eprint/61506/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.61506
record_format eprints
spelling my.uitm.ir.615062022-06-20T08:33:22Z https://ir.uitm.edu.my/id/eprint/61506/ Inspection report procedure in Hotel Perdana / Muhammad Afiq Aiman Mohd Ghazali Mohd Ghazali, Muhammad Afiq Aiman TH Building construction Building inspection Generally, this report is a study on Procedure of Inspection Report that applied at Hotel Perdana Kota Baharu. This study that I’ve made is based on Previous Inspection Report that has been prepared by consultant. This report is divided into a few sections or chapter which is Company Background, Literature Review, Case Study, Comment and Suggestion, and Conclusion. Based on experience and observation at the Hotel Perdana Kota Baharu building, the inspection report that has been prepared by consultant have some weakness and lack of a few content if to be compared with CP BS101 which what I’ve learnt in lecture class before. The procedure is divided into two which is during building in Defect Liability Period (DLP) and after Defect Liability Period (DLP) are over. There is slight difference in process of inspection report prepared between the two periods. I also include with several comments and recommendations from my state of view that can fix or improve the method or format of Inspection Report. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/61506/1/61506.pdf Inspection report procedure in Hotel Perdana / Muhammad Afiq Aiman Mohd Ghazali. (2015) [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Building inspection
spellingShingle TH Building construction
Building inspection
Mohd Ghazali, Muhammad Afiq Aiman
Inspection report procedure in Hotel Perdana / Muhammad Afiq Aiman Mohd Ghazali
description Generally, this report is a study on Procedure of Inspection Report that applied at Hotel Perdana Kota Baharu. This study that I’ve made is based on Previous Inspection Report that has been prepared by consultant. This report is divided into a few sections or chapter which is Company Background, Literature Review, Case Study, Comment and Suggestion, and Conclusion. Based on experience and observation at the Hotel Perdana Kota Baharu building, the inspection report that has been prepared by consultant have some weakness and lack of a few content if to be compared with CP BS101 which what I’ve learnt in lecture class before. The procedure is divided into two which is during building in Defect Liability Period (DLP) and after Defect Liability Period (DLP) are over. There is slight difference in process of inspection report prepared between the two periods. I also include with several comments and recommendations from my state of view that can fix or improve the method or format of Inspection Report.
format Student Project
author Mohd Ghazali, Muhammad Afiq Aiman
author_facet Mohd Ghazali, Muhammad Afiq Aiman
author_sort Mohd Ghazali, Muhammad Afiq Aiman
title Inspection report procedure in Hotel Perdana / Muhammad Afiq Aiman Mohd Ghazali
title_short Inspection report procedure in Hotel Perdana / Muhammad Afiq Aiman Mohd Ghazali
title_full Inspection report procedure in Hotel Perdana / Muhammad Afiq Aiman Mohd Ghazali
title_fullStr Inspection report procedure in Hotel Perdana / Muhammad Afiq Aiman Mohd Ghazali
title_full_unstemmed Inspection report procedure in Hotel Perdana / Muhammad Afiq Aiman Mohd Ghazali
title_sort inspection report procedure in hotel perdana / muhammad afiq aiman mohd ghazali
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/61506/1/61506.pdf
https://ir.uitm.edu.my/id/eprint/61506/
_version_ 1736837340377120768
score 13.160551