Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail

Practical training or also known as industrial training outside the institution is a condition that all student need to get through. Some other course, their industrial training is on semester 4 or semester 5. After that they need to continue their study as usual. But for course Building Surveying,...

Full description

Saved in:
Bibliographic Details
Main Author: Ismail, Mohd Izzat Fahmi
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/61443/1/61443.pdf
https://ir.uitm.edu.my/id/eprint/61443/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.61443
record_format eprints
spelling my.uitm.ir.614432022-06-20T08:56:07Z https://ir.uitm.edu.my/id/eprint/61443/ Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail Ismail, Mohd Izzat Fahmi TH Building construction Protection of buildings. Including protection from dampness, fire, burglary Practical training or also known as industrial training outside the institution is a condition that all student need to get through. Some other course, their industrial training is on semester 4 or semester 5. After that they need to continue their study as usual. But for course Building Surveying, the industrial training is for the last semester. The procedure of applying the place of training is before the second last semester had end. So the student needs to confirm their place of industrial training as soon as possible to avoid any unwanted things happen. The company for industrial training must be related with the course. So the student can learn more and get more experience about the course. Also learn and look how the surveyors work. During the training, the student must write a simple written report in log book that was given by the lecturer. What are the student do every day must be write in the log book by write and also picture for the evidence. The students also need to do the report during the training. The title of the report must be the project that the company is currently doing. The report must be submitted at the end of the industrial training. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/61443/1/61443.pdf Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail. (2015) [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Protection of buildings. Including protection from dampness, fire, burglary
spellingShingle TH Building construction
Protection of buildings. Including protection from dampness, fire, burglary
Ismail, Mohd Izzat Fahmi
Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail
description Practical training or also known as industrial training outside the institution is a condition that all student need to get through. Some other course, their industrial training is on semester 4 or semester 5. After that they need to continue their study as usual. But for course Building Surveying, the industrial training is for the last semester. The procedure of applying the place of training is before the second last semester had end. So the student needs to confirm their place of industrial training as soon as possible to avoid any unwanted things happen. The company for industrial training must be related with the course. So the student can learn more and get more experience about the course. Also learn and look how the surveyors work. During the training, the student must write a simple written report in log book that was given by the lecturer. What are the student do every day must be write in the log book by write and also picture for the evidence. The students also need to do the report during the training. The title of the report must be the project that the company is currently doing. The report must be submitted at the end of the industrial training.
format Student Project
author Ismail, Mohd Izzat Fahmi
author_facet Ismail, Mohd Izzat Fahmi
author_sort Ismail, Mohd Izzat Fahmi
title Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail
title_short Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail
title_full Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail
title_fullStr Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail
title_full_unstemmed Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail
title_sort safety at site (case study at library kerteh & masjid kemasik) / mohd izzat fahmi ismail
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/61443/1/61443.pdf
https://ir.uitm.edu.my/id/eprint/61443/
_version_ 1736837335133192192
score 13.160551