Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail
Practical training or also known as industrial training outside the institution is a condition that all student need to get through. Some other course, their industrial training is on semester 4 or semester 5. After that they need to continue their study as usual. But for course Building Surveying,...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/61443/1/61443.pdf https://ir.uitm.edu.my/id/eprint/61443/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.61443 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.614432022-06-20T08:56:07Z https://ir.uitm.edu.my/id/eprint/61443/ Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail Ismail, Mohd Izzat Fahmi TH Building construction Protection of buildings. Including protection from dampness, fire, burglary Practical training or also known as industrial training outside the institution is a condition that all student need to get through. Some other course, their industrial training is on semester 4 or semester 5. After that they need to continue their study as usual. But for course Building Surveying, the industrial training is for the last semester. The procedure of applying the place of training is before the second last semester had end. So the student needs to confirm their place of industrial training as soon as possible to avoid any unwanted things happen. The company for industrial training must be related with the course. So the student can learn more and get more experience about the course. Also learn and look how the surveyors work. During the training, the student must write a simple written report in log book that was given by the lecturer. What are the student do every day must be write in the log book by write and also picture for the evidence. The students also need to do the report during the training. The title of the report must be the project that the company is currently doing. The report must be submitted at the end of the industrial training. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/61443/1/61443.pdf Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail. (2015) [Student Project] |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction Protection of buildings. Including protection from dampness, fire, burglary |
spellingShingle |
TH Building construction Protection of buildings. Including protection from dampness, fire, burglary Ismail, Mohd Izzat Fahmi Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail |
description |
Practical training or also known as industrial training outside the institution is a condition that all student need to get through. Some other course, their industrial training is on semester 4 or semester 5. After that they need to continue their study as usual. But for course Building Surveying, the industrial training is for the last semester. The procedure of applying the place of training is before the second last semester had end. So the student needs to confirm their place of industrial training as soon as possible to avoid any unwanted things happen. The company for industrial training must be related with the course. So the student can learn more and get more experience about the course. Also learn and look how the surveyors work. During the training, the student must write a simple written report in log book that was given by the lecturer. What are the student do every day must be write in the log book by write and also picture for the evidence. The students also need to do the report during the training. The title of the report must be the project that the company is currently doing. The report must be submitted at the end of the industrial training. |
format |
Student Project |
author |
Ismail, Mohd Izzat Fahmi |
author_facet |
Ismail, Mohd Izzat Fahmi |
author_sort |
Ismail, Mohd Izzat Fahmi |
title |
Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail |
title_short |
Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail |
title_full |
Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail |
title_fullStr |
Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail |
title_full_unstemmed |
Safety at site (Case study at Library Kerteh & Masjid Kemasik) / Mohd Izzat Fahmi Ismail |
title_sort |
safety at site (case study at library kerteh & masjid kemasik) / mohd izzat fahmi ismail |
publishDate |
2015 |
url |
https://ir.uitm.edu.my/id/eprint/61443/1/61443.pdf https://ir.uitm.edu.my/id/eprint/61443/ |
_version_ |
1736837335133192192 |
score |
13.160551 |