Development of assembly floor layout / Firhaein Aqmar Rosli

SIRIM Micro Precision (SMP), a unit under SIRIM Berhad located in Shah Alam has developed a multi orientation micro precision grinding machine branded TCG8. It is a machine capable of producing precision cutting and milling tools among other capabilities with an accuracy of +/- 2 microns and able to...

Full description

Saved in:
Bibliographic Details
Main Author: Rosli, Firhaein Aqmar
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/61126/1/61126.pdf
https://ir.uitm.edu.my/id/eprint/61126/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.61126
record_format eprints
spelling my.uitm.ir.611262022-07-20T23:53:54Z https://ir.uitm.edu.my/id/eprint/61126/ Development of assembly floor layout / Firhaein Aqmar Rosli Rosli, Firhaein Aqmar Process control Production control SIRIM Micro Precision (SMP), a unit under SIRIM Berhad located in Shah Alam has developed a multi orientation micro precision grinding machine branded TCG8. It is a machine capable of producing precision cutting and milling tools among other capabilities with an accuracy of +/- 2 microns and able to work on hard materials such as tungsten carbide. With TCG8 recently being pushed into commercialization stage from research and development, SIRIM Berhad is gearing towards the production stage of the machine. This project aims to develop a plant layout consisting of an assembly work area that enables workers to perform duties in optimal time with minimum capital. Data regarding the production of the TCG8 and the production area are collected by visits and discussions with SMP. A plant layout designed previously by SMP but not yet implemented is simulated using DELMIA Quest to obtain the production time and workers' travel distance. Another layout design is produced and simulated using DELMIA Quest in which certain data are manipulated such as number of workers and positioning of work cells. The layout designs are evaluated by certain factors that have been studied to obtain an optimized layout which are listed in an evaluation matrix table and filled by the staffs of SMP and result of the simulation of all layout designs are compared. Staffs of SMP have agreed that the new layout design have more points that adhere to the evaluation method and there is an improvement in terms of production time and workers' travel distance although there are still room for more improvement 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/61126/1/61126.pdf Development of assembly floor layout / Firhaein Aqmar Rosli. (2015) [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Process control
Production control
spellingShingle Process control
Production control
Rosli, Firhaein Aqmar
Development of assembly floor layout / Firhaein Aqmar Rosli
description SIRIM Micro Precision (SMP), a unit under SIRIM Berhad located in Shah Alam has developed a multi orientation micro precision grinding machine branded TCG8. It is a machine capable of producing precision cutting and milling tools among other capabilities with an accuracy of +/- 2 microns and able to work on hard materials such as tungsten carbide. With TCG8 recently being pushed into commercialization stage from research and development, SIRIM Berhad is gearing towards the production stage of the machine. This project aims to develop a plant layout consisting of an assembly work area that enables workers to perform duties in optimal time with minimum capital. Data regarding the production of the TCG8 and the production area are collected by visits and discussions with SMP. A plant layout designed previously by SMP but not yet implemented is simulated using DELMIA Quest to obtain the production time and workers' travel distance. Another layout design is produced and simulated using DELMIA Quest in which certain data are manipulated such as number of workers and positioning of work cells. The layout designs are evaluated by certain factors that have been studied to obtain an optimized layout which are listed in an evaluation matrix table and filled by the staffs of SMP and result of the simulation of all layout designs are compared. Staffs of SMP have agreed that the new layout design have more points that adhere to the evaluation method and there is an improvement in terms of production time and workers' travel distance although there are still room for more improvement
format Student Project
author Rosli, Firhaein Aqmar
author_facet Rosli, Firhaein Aqmar
author_sort Rosli, Firhaein Aqmar
title Development of assembly floor layout / Firhaein Aqmar Rosli
title_short Development of assembly floor layout / Firhaein Aqmar Rosli
title_full Development of assembly floor layout / Firhaein Aqmar Rosli
title_fullStr Development of assembly floor layout / Firhaein Aqmar Rosli
title_full_unstemmed Development of assembly floor layout / Firhaein Aqmar Rosli
title_sort development of assembly floor layout / firhaein aqmar rosli
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/61126/1/61126.pdf
https://ir.uitm.edu.my/id/eprint/61126/
_version_ 1739834072096571392
score 13.160551