Improvement of front corner module assembly process using simulation / Nur Adzly Mohamad Saad
This study is to fulfil high ordering demand for Front Comer Module from customer which focusing on increasing the output capacity on the assembly line process by changing manpower setting and also by improving the current layout. Fulfilling customer demand is important because this will reflect the...
Saved in:
Main Author: | Mohamad Saad, Nur Adzly |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/61078/1/61078.pdf https://ir.uitm.edu.my/id/eprint/61078/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Improvement of reinforcement floor front under left/right in small press line through line balancing / Nur Ain Nabilah Ithnin
by: Ithnin, Nur Ain Nabilah
Published: (2016) -
Improvement of body welding accuracy percentage / Tajul Hasran Tumeran
by: Tumeran, Tajul Hasran
Published: (2010) -
To study the work design of a small manufacturing industry in order to improve its productivity / Azli Mohamed and Zuraimi Borhan
by: Mohamed, Azli, et al.
Published: (2001) -
Lean manufacturing implementation in an automotive assembly line / Nurul Hayati Abdul Halim
by: Abdul Halim, Nurul Hayati
Published: (2012) -
Development of material information flow control / Mohamad Farid Ariffin Mohd Yunus
by: Mohd Yunus, Mohamad Farid Ariffin
Published: (2015)