Adjustable facade handling track / Suaidah Shima Shahrin
Material handling refers to the delivery, movement, safety, storage, or control of materials. Today, Material handling been one of the most critical part on the high-rise construction. The aim of this study is to investigate the problem of handling façade on a high-rise building and to invent innova...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/59742/1/59742.pdf https://ir.uitm.edu.my/id/eprint/59742/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.59742 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.597422022-05-31T07:10:48Z https://ir.uitm.edu.my/id/eprint/59742/ Adjustable facade handling track / Suaidah Shima Shahrin Shahrin, Suaidah Shima TH Building construction Construction equipment in building Material handling refers to the delivery, movement, safety, storage, or control of materials. Today, Material handling been one of the most critical part on the high-rise construction. The aim of this study is to investigate the problem of handling façade on a high-rise building and to invent innovation product that are better and safer. The study adopts several data collection tools to collect data to gain reliable information on the innovation idea such as questionnaire survey and literature review from the primary and secondary data collection. The study found that current facade handling was having problem with wind sensibility and safety issue. From the result, an innovation idea of the Adjustable Façade Handling Track was created to encounter the problems identified that has been occurred during the façade handling work. Besides, the performances of the Adjustable Façade Handling Track were expected to provide better workability . However, it is recommended to improve the safety features by install rubber stopper on the side of I beam trolley and I beam to avoid from out of track to improve the equipment performance. 2021 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/59742/1/59742.pdf Adjustable facade handling track / Suaidah Shima Shahrin. (2021) [Student Project] |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction Construction equipment in building |
spellingShingle |
TH Building construction Construction equipment in building Shahrin, Suaidah Shima Adjustable facade handling track / Suaidah Shima Shahrin |
description |
Material handling refers to the delivery, movement, safety, storage, or control of materials. Today, Material handling been one of the most critical part on the high-rise construction. The aim of this study is to investigate the problem of handling façade on a high-rise building and to invent innovation product that are better and safer. The study adopts several data collection tools to collect data to gain reliable information on the innovation idea such as questionnaire survey and literature review from the primary and secondary data collection. The study found that current facade handling was having problem with wind sensibility and safety issue. From the result, an innovation idea of the Adjustable Façade Handling Track was created to encounter the problems identified that has been occurred during the façade handling work. Besides, the performances of the Adjustable Façade Handling Track were expected to provide better workability . However, it is recommended to improve the safety features by install rubber stopper on the side of I beam trolley and I beam to avoid from out of track to improve the equipment performance. |
format |
Student Project |
author |
Shahrin, Suaidah Shima |
author_facet |
Shahrin, Suaidah Shima |
author_sort |
Shahrin, Suaidah Shima |
title |
Adjustable facade handling track / Suaidah Shima Shahrin |
title_short |
Adjustable facade handling track / Suaidah Shima Shahrin |
title_full |
Adjustable facade handling track / Suaidah Shima Shahrin |
title_fullStr |
Adjustable facade handling track / Suaidah Shima Shahrin |
title_full_unstemmed |
Adjustable facade handling track / Suaidah Shima Shahrin |
title_sort |
adjustable facade handling track / suaidah shima shahrin |
publishDate |
2021 |
url |
https://ir.uitm.edu.my/id/eprint/59742/1/59742.pdf https://ir.uitm.edu.my/id/eprint/59742/ |
_version_ |
1735389640097005568 |
score |
13.211869 |