Electrical service / Muhammad Hilman Mohmad Omar
This report is about the industrial training at Impiana Hotel, Ipoh for 4 months from 1 December 2016 – 31 Mac 2017.The aim of this report is to summarize the knowledge and activities during internships period. For this industrial training, I have been placed at engineering departments which are ope...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/56819/1/56819.pdf https://ir.uitm.edu.my/id/eprint/56819/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This report is about the industrial training at Impiana Hotel, Ipoh for 4 months from 1 December 2016 – 31 Mac 2017.The aim of this report is to summarize the knowledge and activities during internships period. For this industrial training, I have been placed at engineering departments which are operation team and preventive team. In engineering department have operation team, preventive team and boiler team. For the operation team, they do the operation when that have complain for guest and have work order to being repair. For the preventive team is in actions at the prevention of breakdowns and failures. Meanwhile, for the boiler man control the boiler room to make sure boilers to heat water, hot water or steam in good condition. Throughout this industrial training, I have been exposed various equipment used in working environment as preparation before working in real life. |
---|