Procedure of post contract administration, case study: Damansara City 2, Kuala Lumpur / Intan Nor Atika Zainal Abidin
In this chapter is about the detail of HeiTech Padu Berhad which is including the owner of the property, building background, project brief, list of major occupants, all the information of the building has been obtained from the Facilities Manager of KCSB Maintenance Services Sdn. Bhd. The building...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/56590/1/56590.pdf https://ir.uitm.edu.my/id/eprint/56590/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.56590 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.565902022-03-05T15:17:42Z https://ir.uitm.edu.my/id/eprint/56590/ Procedure of post contract administration, case study: Damansara City 2, Kuala Lumpur / Intan Nor Atika Zainal Abidin Zainal Abidin, Intan Nor Atika TH Building construction Management of the construction site. Superintendence of building construction In this chapter is about the detail of HeiTech Padu Berhad which is including the owner of the property, building background, project brief, list of major occupants, all the information of the building has been obtained from the Facilities Manager of KCSB Maintenance Services Sdn. Bhd. The building is located at Subang Jaya USJ/1 near to SEGi Collage and The Summit shopping mall. The building had a beautiful view from everywhere side especially right side overlooking the Shah Alam expressway. It is also state seat constituency between Shah Alam and Petaling Jaya. Kayangan Cahaya Sdn Bhd is outsource for HeiTech Padu Village of maintenance service to maintain the building at every part of services. HeiTech Padu at USJ 1 is the main office which is had more than 10 department. Kayangan Cahaya is another department on the building but also have been moved to back side of the building, at Impian Meridian. The owner of the building Heitech Padu Berhad is Permodalan National Berhad or the National Equity Corporation. The policy of PNB is to help rectify the economic imbalance in the Malaysian society. Heitech Padu Berhad is outsourcing contract from PNB, responsibility Heitech Padu Berhad is need to manage the building with the best possible. 2016 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/56590/1/56590.pdf ID56590 Zainal Abidin, Intan Nor Atika (2016) Procedure of post contract administration, case study: Damansara City 2, Kuala Lumpur / Intan Nor Atika Zainal Abidin. [Student Project] |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction Management of the construction site. Superintendence of building construction |
spellingShingle |
TH Building construction Management of the construction site. Superintendence of building construction Zainal Abidin, Intan Nor Atika Procedure of post contract administration, case study: Damansara City 2, Kuala Lumpur / Intan Nor Atika Zainal Abidin |
description |
In this chapter is about the detail of HeiTech Padu Berhad which is including the owner of the property, building background, project brief, list of major occupants, all the information of the building has been obtained from the Facilities Manager of KCSB Maintenance Services Sdn. Bhd. The building is located at Subang Jaya USJ/1 near to SEGi Collage and The Summit shopping mall. The building had a beautiful view from everywhere side especially right side overlooking the Shah Alam expressway. It is also state seat constituency between Shah Alam and Petaling Jaya. Kayangan Cahaya Sdn Bhd is outsource for HeiTech Padu Village of maintenance service to maintain the building at every part of services. HeiTech Padu at USJ 1 is the main office which is had more than 10 department. Kayangan Cahaya is another department on the building but also have been moved to back side of the building, at Impian Meridian. The owner of the building Heitech Padu Berhad is Permodalan National Berhad or the National Equity Corporation. The policy of PNB is to help rectify the economic imbalance in the Malaysian society. Heitech Padu Berhad is outsourcing contract from PNB, responsibility Heitech Padu Berhad is need to manage the building with the best possible. |
format |
Student Project |
author |
Zainal Abidin, Intan Nor Atika |
author_facet |
Zainal Abidin, Intan Nor Atika |
author_sort |
Zainal Abidin, Intan Nor Atika |
title |
Procedure of post contract administration, case study: Damansara City 2, Kuala Lumpur / Intan Nor Atika Zainal Abidin |
title_short |
Procedure of post contract administration, case study: Damansara City 2, Kuala Lumpur / Intan Nor Atika Zainal Abidin |
title_full |
Procedure of post contract administration, case study: Damansara City 2, Kuala Lumpur / Intan Nor Atika Zainal Abidin |
title_fullStr |
Procedure of post contract administration, case study: Damansara City 2, Kuala Lumpur / Intan Nor Atika Zainal Abidin |
title_full_unstemmed |
Procedure of post contract administration, case study: Damansara City 2, Kuala Lumpur / Intan Nor Atika Zainal Abidin |
title_sort |
procedure of post contract administration, case study: damansara city 2, kuala lumpur / intan nor atika zainal abidin |
publishDate |
2016 |
url |
https://ir.uitm.edu.my/id/eprint/56590/1/56590.pdf https://ir.uitm.edu.my/id/eprint/56590/ |
_version_ |
1726795682335948800 |
score |
13.211869 |