Timber roof trusses installation process, Pasar Paka, Dungun / Muhamad Arif Roslin

Industry Training is a main component in learning at Universiti Teknologi MARA (UiTM) and for every student who attended either a diploma or certificate courses. Students are required to pass the industrial training before they are certified for the award of the Certificate or Diploma. Students purs...

Full description

Saved in:
Bibliographic Details
Main Author: Roslin, Muhamad Arif
Format: Student Project
Language:English
Published: 2016
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/56566/1/56566.pdf
https://ir.uitm.edu.my/id/eprint/56566/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.56566
record_format eprints
spelling my.uitm.ir.565662022-03-04T08:06:36Z https://ir.uitm.edu.my/id/eprint/56566/ Timber roof trusses installation process, Pasar Paka, Dungun / Muhamad Arif Roslin Roslin, Muhamad Arif TH Building construction Roofing Industry Training is a main component in learning at Universiti Teknologi MARA (UiTM) and for every student who attended either a diploma or certificate courses. Students are required to pass the industrial training before they are certified for the award of the Certificate or Diploma. Students pursuing diploma courses will undergo their practical training in the sixth semester for 4 months and in addition, students are required to prepare a report based on the task of industrial training was conducted and performed during the industrial training.During practical training,the topic of the report based on scope of work for the company. Haustek Engineering as a company who undertaken the Industrilized building system which is prefabricated timber framing and block system. From my experience,I should to desribes about the IBS system.For the case study,I choose the renovation work for roof trusses at Pasar Paka,Dungun. The case study used prefabricated timber framing system,It included the IBS system.IBS system have a special method of contruction because there have good planning.In the report,I describes the process of the timber trusses start from design stage to installation stages. 2016 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/56566/1/56566.pdf ID56566 Roslin, Muhamad Arif (2016) Timber roof trusses installation process, Pasar Paka, Dungun / Muhamad Arif Roslin. [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Roofing
spellingShingle TH Building construction
Roofing
Roslin, Muhamad Arif
Timber roof trusses installation process, Pasar Paka, Dungun / Muhamad Arif Roslin
description Industry Training is a main component in learning at Universiti Teknologi MARA (UiTM) and for every student who attended either a diploma or certificate courses. Students are required to pass the industrial training before they are certified for the award of the Certificate or Diploma. Students pursuing diploma courses will undergo their practical training in the sixth semester for 4 months and in addition, students are required to prepare a report based on the task of industrial training was conducted and performed during the industrial training.During practical training,the topic of the report based on scope of work for the company. Haustek Engineering as a company who undertaken the Industrilized building system which is prefabricated timber framing and block system. From my experience,I should to desribes about the IBS system.For the case study,I choose the renovation work for roof trusses at Pasar Paka,Dungun. The case study used prefabricated timber framing system,It included the IBS system.IBS system have a special method of contruction because there have good planning.In the report,I describes the process of the timber trusses start from design stage to installation stages.
format Student Project
author Roslin, Muhamad Arif
author_facet Roslin, Muhamad Arif
author_sort Roslin, Muhamad Arif
title Timber roof trusses installation process, Pasar Paka, Dungun / Muhamad Arif Roslin
title_short Timber roof trusses installation process, Pasar Paka, Dungun / Muhamad Arif Roslin
title_full Timber roof trusses installation process, Pasar Paka, Dungun / Muhamad Arif Roslin
title_fullStr Timber roof trusses installation process, Pasar Paka, Dungun / Muhamad Arif Roslin
title_full_unstemmed Timber roof trusses installation process, Pasar Paka, Dungun / Muhamad Arif Roslin
title_sort timber roof trusses installation process, pasar paka, dungun / muhamad arif roslin
publishDate 2016
url https://ir.uitm.edu.my/id/eprint/56566/1/56566.pdf
https://ir.uitm.edu.my/id/eprint/56566/
_version_ 1726795681591459840
score 13.19449