An analysis of non compliance report based on quality assessment system in construction, case study: Perak Darul Ridzuan / Nur Anis Nawi

The construction industry often associated with quality issue in project management. Nowadays, the government was launch one of the program to improve the quality and worker products under Construction Industry Development Board (CIDB) in the effort in enhance the building quality. This research to...

Full description

Saved in:
Bibliographic Details
Main Author: Nawi, Nur Anis
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/56434/1/56434.pdf
https://ir.uitm.edu.my/id/eprint/56434/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.56434
record_format eprints
spelling my.uitm.ir.564342022-03-06T00:40:29Z https://ir.uitm.edu.my/id/eprint/56434/ An analysis of non compliance report based on quality assessment system in construction, case study: Perak Darul Ridzuan / Nur Anis Nawi Nawi, Nur Anis TH Building construction Building inspection The construction industry often associated with quality issue in project management. Nowadays, the government was launch one of the program to improve the quality and worker products under Construction Industry Development Board (CIDB) in the effort in enhance the building quality. This research to identify implementation of quality assessment system (QLASSIC) will provide the effect to improve the quality and produce good product. The noncompliance report (NCR) will be issued if the quality assessment system (QLASSIC) does not comply the specification work in the recheck of working conducted until fulfill the specification working. Besides that, noncompliance report (NCR) will be issued in various category namely structure element, architectural element, mechanical and electrical and external work. This research involve data collection from the department of project team through questionnaires have been distribute to 53 respondent and 12 respondents for personal interview with the professional parties in construction industry in Perak. As a result, the decision was determine types of noncompliance of work based on the level whether major or minor defect that involved in noncompliance report (NCR) on building construction. In conclusion, quality performance was to improve the productivity of building based on compliance specification work from early stage until building finished and was be stand in long lifespan in future. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/56434/1/56434.pdf ID56434 Nawi, Nur Anis (2015) An analysis of non compliance report based on quality assessment system in construction, case study: Perak Darul Ridzuan / Nur Anis Nawi. [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Building inspection
spellingShingle TH Building construction
Building inspection
Nawi, Nur Anis
An analysis of non compliance report based on quality assessment system in construction, case study: Perak Darul Ridzuan / Nur Anis Nawi
description The construction industry often associated with quality issue in project management. Nowadays, the government was launch one of the program to improve the quality and worker products under Construction Industry Development Board (CIDB) in the effort in enhance the building quality. This research to identify implementation of quality assessment system (QLASSIC) will provide the effect to improve the quality and produce good product. The noncompliance report (NCR) will be issued if the quality assessment system (QLASSIC) does not comply the specification work in the recheck of working conducted until fulfill the specification working. Besides that, noncompliance report (NCR) will be issued in various category namely structure element, architectural element, mechanical and electrical and external work. This research involve data collection from the department of project team through questionnaires have been distribute to 53 respondent and 12 respondents for personal interview with the professional parties in construction industry in Perak. As a result, the decision was determine types of noncompliance of work based on the level whether major or minor defect that involved in noncompliance report (NCR) on building construction. In conclusion, quality performance was to improve the productivity of building based on compliance specification work from early stage until building finished and was be stand in long lifespan in future.
format Student Project
author Nawi, Nur Anis
author_facet Nawi, Nur Anis
author_sort Nawi, Nur Anis
title An analysis of non compliance report based on quality assessment system in construction, case study: Perak Darul Ridzuan / Nur Anis Nawi
title_short An analysis of non compliance report based on quality assessment system in construction, case study: Perak Darul Ridzuan / Nur Anis Nawi
title_full An analysis of non compliance report based on quality assessment system in construction, case study: Perak Darul Ridzuan / Nur Anis Nawi
title_fullStr An analysis of non compliance report based on quality assessment system in construction, case study: Perak Darul Ridzuan / Nur Anis Nawi
title_full_unstemmed An analysis of non compliance report based on quality assessment system in construction, case study: Perak Darul Ridzuan / Nur Anis Nawi
title_sort analysis of non compliance report based on quality assessment system in construction, case study: perak darul ridzuan / nur anis nawi
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/56434/1/56434.pdf
https://ir.uitm.edu.my/id/eprint/56434/
_version_ 1726795675300003840
score 13.160551