Construction of RC frame / Mohammad Huzairi Mohd Husni

An opportunity has been given to fulfil the internship program at Faridaz Development Sdn Bhd. Faridaz Development is the company that is known as the main contractor especially in property developer and renovation work. The company develop the property according to the client’s demand in various sp...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Husni, Mohammad Huzairi
Format: Monograph
Language:English
Published: Universiti Teknologi Mara, Perak 2018
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/49682/1/49682.pdf
https://ir.uitm.edu.my/id/eprint/49682/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.49682
record_format eprints
spelling my.uitm.ir.496822021-08-31T15:50:40Z https://ir.uitm.edu.my/id/eprint/49682/ Construction of RC frame / Mohammad Huzairi Mohd Husni Mohd Husni, Mohammad Huzairi Details in building design and construction.Including walls, roofs Management of the construction site. Superintendence of building construction Construction by phase of the work (Building trades) Building fittings and their installation Building control systems Architectural engineering. Structural engineering of buildings Sustainable buildings. Sustainable construction An opportunity has been given to fulfil the internship program at Faridaz Development Sdn Bhd. Faridaz Development is the company that is known as the main contractor especially in property developer and renovation work. The company develop the property according to the client’s demand in various specification. As the trainee of the company. I was assigned in team project which supervise the construction progress of the company project. The supervisor need to ensure the project’s method statement and specification of the material is according to the agreement. Also on the supervising of the progress and reporting to the company for claim work. For the first task, I was assigned to supervise the remedial work at the client property that had been hack due to crack caused by surrounding vibration and minor settlement. The location of the property is surrounded by heavy machinery such as piling driving work. The vibration on surrounding effect the house and cause crack. The task is to ensure the labour remedy the crack with the correct procedure and method with the correct material. As for other, the problem that had been recognized during internship program had been analyzed and had been come out with the recommendation to overcome the problem before getting severe. Universiti Teknologi Mara, Perak 2018 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/49682/1/49682.pdf ID49682 Mohd Husni, Mohammad Huzairi (2018) Construction of RC frame / Mohammad Huzairi Mohd Husni. Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Details in building design and construction.Including walls, roofs
Management of the construction site. Superintendence of building construction
Construction by phase of the work (Building trades)
Building fittings and their installation
Building control systems
Architectural engineering. Structural engineering of buildings
Sustainable buildings. Sustainable construction
spellingShingle Details in building design and construction.Including walls, roofs
Management of the construction site. Superintendence of building construction
Construction by phase of the work (Building trades)
Building fittings and their installation
Building control systems
Architectural engineering. Structural engineering of buildings
Sustainable buildings. Sustainable construction
Mohd Husni, Mohammad Huzairi
Construction of RC frame / Mohammad Huzairi Mohd Husni
description An opportunity has been given to fulfil the internship program at Faridaz Development Sdn Bhd. Faridaz Development is the company that is known as the main contractor especially in property developer and renovation work. The company develop the property according to the client’s demand in various specification. As the trainee of the company. I was assigned in team project which supervise the construction progress of the company project. The supervisor need to ensure the project’s method statement and specification of the material is according to the agreement. Also on the supervising of the progress and reporting to the company for claim work. For the first task, I was assigned to supervise the remedial work at the client property that had been hack due to crack caused by surrounding vibration and minor settlement. The location of the property is surrounded by heavy machinery such as piling driving work. The vibration on surrounding effect the house and cause crack. The task is to ensure the labour remedy the crack with the correct procedure and method with the correct material. As for other, the problem that had been recognized during internship program had been analyzed and had been come out with the recommendation to overcome the problem before getting severe.
format Monograph
author Mohd Husni, Mohammad Huzairi
author_facet Mohd Husni, Mohammad Huzairi
author_sort Mohd Husni, Mohammad Huzairi
title Construction of RC frame / Mohammad Huzairi Mohd Husni
title_short Construction of RC frame / Mohammad Huzairi Mohd Husni
title_full Construction of RC frame / Mohammad Huzairi Mohd Husni
title_fullStr Construction of RC frame / Mohammad Huzairi Mohd Husni
title_full_unstemmed Construction of RC frame / Mohammad Huzairi Mohd Husni
title_sort construction of rc frame / mohammad huzairi mohd husni
publisher Universiti Teknologi Mara, Perak
publishDate 2018
url https://ir.uitm.edu.my/id/eprint/49682/1/49682.pdf
https://ir.uitm.edu.my/id/eprint/49682/
_version_ 1709671437569097728
score 13.214268