Installation of chiller at Impiana Hotel Ipoh / Muhammad Roziqin Khalid

The purpose of practical training is to make sure that I apply what I’ve learned from 1st semester until 5th semester. It compulsory for Building Survey student for their last semester before they finish their study in diploma. By doing an internship, I choose maintenance management as a report tit...

Full description

Saved in:
Bibliographic Details
Main Author: Khalid, Muhammad Roziqin
Format: Monograph
Language:English
Published: Universiti Teknologi Mara, Perak 2018
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/49097/1/49097.pdf
http://ir.uitm.edu.my/id/eprint/49097/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.49097
record_format eprints
spelling my.uitm.ir.490972021-07-27T07:52:23Z http://ir.uitm.edu.my/id/eprint/49097/ Installation of chiller at Impiana Hotel Ipoh / Muhammad Roziqin Khalid Khalid, Muhammad Roziqin Building fittings and their installation Building control systems Heating and ventilation. Air conditioning Malaysia Architectural engineering. Structural engineering of buildings Sustainable buildings. Sustainable construction The purpose of practical training is to make sure that I apply what I’ve learned from 1st semester until 5th semester. It compulsory for Building Survey student for their last semester before they finish their study in diploma. By doing an internship, I choose maintenance management as a report title. Impiana Hotel Ipoh is the place that I choose to finish my last semester. I was required to write a log books from first month, 1 March 2018 until my last month of internship 29 Jun 2018. I also need to find something to make my report as requirement of this internship. I choose chiller installation at this hotel as my report. As a conclusion, by this practical training. I gain more knowledge about maintenance management, maintenance work and much more. I fell so glad from this practical training, I learned more about chiller and HVAC system. It is because I choose chiller installation as my report. I also know about it component and how it work in the building. So, this practical training is very useful for me to gain more knowledge and gain an experience about work. Universiti Teknologi Mara, Perak 2018 Monograph NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/49097/1/49097.pdf ID49097 Khalid, Muhammad Roziqin (2018) Installation of chiller at Impiana Hotel Ipoh / Muhammad Roziqin Khalid. Industrial / Practical Training Report. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Building fittings and their installation
Building control systems
Heating and ventilation. Air conditioning
Malaysia
Architectural engineering. Structural engineering of buildings
Sustainable buildings. Sustainable construction
spellingShingle Building fittings and their installation
Building control systems
Heating and ventilation. Air conditioning
Malaysia
Architectural engineering. Structural engineering of buildings
Sustainable buildings. Sustainable construction
Khalid, Muhammad Roziqin
Installation of chiller at Impiana Hotel Ipoh / Muhammad Roziqin Khalid
description The purpose of practical training is to make sure that I apply what I’ve learned from 1st semester until 5th semester. It compulsory for Building Survey student for their last semester before they finish their study in diploma. By doing an internship, I choose maintenance management as a report title. Impiana Hotel Ipoh is the place that I choose to finish my last semester. I was required to write a log books from first month, 1 March 2018 until my last month of internship 29 Jun 2018. I also need to find something to make my report as requirement of this internship. I choose chiller installation at this hotel as my report. As a conclusion, by this practical training. I gain more knowledge about maintenance management, maintenance work and much more. I fell so glad from this practical training, I learned more about chiller and HVAC system. It is because I choose chiller installation as my report. I also know about it component and how it work in the building. So, this practical training is very useful for me to gain more knowledge and gain an experience about work.
format Monograph
author Khalid, Muhammad Roziqin
author_facet Khalid, Muhammad Roziqin
author_sort Khalid, Muhammad Roziqin
title Installation of chiller at Impiana Hotel Ipoh / Muhammad Roziqin Khalid
title_short Installation of chiller at Impiana Hotel Ipoh / Muhammad Roziqin Khalid
title_full Installation of chiller at Impiana Hotel Ipoh / Muhammad Roziqin Khalid
title_fullStr Installation of chiller at Impiana Hotel Ipoh / Muhammad Roziqin Khalid
title_full_unstemmed Installation of chiller at Impiana Hotel Ipoh / Muhammad Roziqin Khalid
title_sort installation of chiller at impiana hotel ipoh / muhammad roziqin khalid
publisher Universiti Teknologi Mara, Perak
publishDate 2018
url http://ir.uitm.edu.my/id/eprint/49097/1/49097.pdf
http://ir.uitm.edu.my/id/eprint/49097/
_version_ 1706960469098496000
score 13.18916