Construction supervisor's scope of work during the building construction and construction process / Muhammad Fithri Khamaruzzaman
This practical training report of MUHAMMAD FITHRI BIN KHAMARUZZAMAN to undergo an industrial training for duration of 4 month before completing the diploma courses. Starting industrial training on 1st March 2018 until 31st June 18 at TENAGA JAYA CONSTRUCTION which guided by Puan Aisya. The purpose o...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2018
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/48984/1/48984.pdf http://ir.uitm.edu.my/id/eprint/48984/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.48984 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.489842021-07-22T07:37:33Z http://ir.uitm.edu.my/id/eprint/48984/ Construction supervisor's scope of work during the building construction and construction process / Muhammad Fithri Khamaruzzaman Khamaruzzaman, Muhammad Fithri Systems of building construction. Industrialized building Malaysia Management of the construction site. Superintendence of building construction Architectural engineering. Structural engineering of buildings Sustainable buildings. Sustainable construction This practical training report of MUHAMMAD FITHRI BIN KHAMARUZZAMAN to undergo an industrial training for duration of 4 month before completing the diploma courses. Starting industrial training on 1st March 2018 until 31st June 18 at TENAGA JAYA CONSTRUCTION which guided by Puan Aisya. The purpose of this program is to fulfil the course in order to complete the Diploma as well as graduate from the college. The training refers to work experience that is relevant to professional development prior to graduate. In first chapter this report is defining the term of industrial training and description to industrial training objectives. This part explains the details of objectives of industrial training report and industrial report. In second chapter of report is overview of the company and department. For my practical training, I did at Tenaga Jaya Construction which the site located at Endau Rompin, Kota Seriemas Nilai and Sungai Merab Bangi. I was assigned at construction site which my supervisor Puan Aisyah. Universiti Teknologi Mara, Perak 2018 Monograph NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/48984/1/48984.pdf ID48984 Khamaruzzaman, Muhammad Fithri (2018) Construction supervisor's scope of work during the building construction and construction process / Muhammad Fithri Khamaruzzaman. Industrial / Practical Training Report. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Systems of building construction. Industrialized building Malaysia Management of the construction site. Superintendence of building construction Architectural engineering. Structural engineering of buildings Sustainable buildings. Sustainable construction |
spellingShingle |
Systems of building construction. Industrialized building Malaysia Management of the construction site. Superintendence of building construction Architectural engineering. Structural engineering of buildings Sustainable buildings. Sustainable construction Khamaruzzaman, Muhammad Fithri Construction supervisor's scope of work during the building construction and construction process / Muhammad Fithri Khamaruzzaman |
description |
This practical training report of MUHAMMAD FITHRI BIN KHAMARUZZAMAN to undergo an industrial training for duration of 4 month before completing the diploma courses. Starting industrial training on 1st March 2018 until 31st June 18 at TENAGA JAYA CONSTRUCTION which guided by Puan Aisya. The purpose of this program is to fulfil the course in order to complete the Diploma as well as graduate from the college. The training refers to work experience that is relevant to professional development prior to graduate. In first chapter this report is defining the term of industrial training and description to industrial training objectives. This part explains the details of objectives of industrial training report and industrial report. In second chapter of report is overview of the company and department. For my practical training, I did at Tenaga Jaya Construction which the site located at Endau Rompin, Kota Seriemas Nilai and Sungai Merab Bangi. I was assigned at construction site which my supervisor Puan Aisyah. |
format |
Monograph |
author |
Khamaruzzaman, Muhammad Fithri |
author_facet |
Khamaruzzaman, Muhammad Fithri |
author_sort |
Khamaruzzaman, Muhammad Fithri |
title |
Construction supervisor's scope of work during the building construction and construction process / Muhammad Fithri Khamaruzzaman |
title_short |
Construction supervisor's scope of work during the building construction and construction process / Muhammad Fithri Khamaruzzaman |
title_full |
Construction supervisor's scope of work during the building construction and construction process / Muhammad Fithri Khamaruzzaman |
title_fullStr |
Construction supervisor's scope of work during the building construction and construction process / Muhammad Fithri Khamaruzzaman |
title_full_unstemmed |
Construction supervisor's scope of work during the building construction and construction process / Muhammad Fithri Khamaruzzaman |
title_sort |
construction supervisor's scope of work during the building construction and construction process / muhammad fithri khamaruzzaman |
publisher |
Universiti Teknologi Mara, Perak |
publishDate |
2018 |
url |
http://ir.uitm.edu.my/id/eprint/48984/1/48984.pdf http://ir.uitm.edu.my/id/eprint/48984/ |
_version_ |
1706960461984956416 |
score |
13.160551 |