Reconstruction and improvement of poor schools using Industrialised Building System (IBS) methods / Hazreezan Sarip
Public Work Department has handled on diverse aspects of life of Malysians since 100 year ago. PWD has endowed with infrastructure and a better atmosphere for day by day life. PWD was also trustworthily for building road as a way to communicate that which is the main mechanism in the socio-economic...
Saved in:
Main Author: | Sarip, Hazreezan |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2018
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/48878/1/48878.pdf http://ir.uitm.edu.my/id/eprint/48878/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Retrofitting model for old building to improve safety factors in building and construction / Nurfaiqah Jamri ... [et al.]
by: Jamri, Nurfaiqah, et al.
Published: (2019) -
Ezidek system industrialised building system / Muhammad Nurhamzah Khairi
by: Khairi, Muhammad Nurhamzah
Published: (2014) -
Evaluating energy optimization through BIM simulation analysis for office buildings in Malaysia / Mohamad Shahin Shahdan ... [et al.]
by: Shahdan, Mohamad Shahin, et al.
Published: (2021) -
Prevalence of comorbidities & risk factors for Multidrug Resistance among Tuberculosis patients in Institute of Respiratory Medicine, Kuala Lumpur / Alia Azmi
by: Azmi, Alia
Published: (2013) -
Industrialised building system (IBS): interlocking solid panel / Nor Wardina Yaakob
by: Yaakob, Nor Wardina
Published: (2022)