Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah

This report is about all the information about the case study through practical training under Jabatan Kerja Raya (JKR) Daerah Bera. The topic of the practical training report is The Installation of Precast Reinforcement Concrete (R.C) Piles for Double-Storey Building. The selected topic is based on...

Full description

Saved in:
Bibliographic Details
Main Author: Amir Hamzah, Noor A’kashah
Format: Monograph
Language:English
Published: Universiti Teknologi Mara, Perak 2018
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/48868/1/48868.pdf
http://ir.uitm.edu.my/id/eprint/48868/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.48868
record_format eprints
spelling my.uitm.ir.488682021-07-26T01:34:12Z http://ir.uitm.edu.my/id/eprint/48868/ Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah Amir Hamzah, Noor A’kashah Concrete Strength and testing Reinforced concrete Malaysia Piles and pile-driving This report is about all the information about the case study through practical training under Jabatan Kerja Raya (JKR) Daerah Bera. The topic of the practical training report is The Installation of Precast Reinforcement Concrete (R.C) Piles for Double-Storey Building. The selected topic is based on the work in progress at the construction site which is the substructure works. In this report, the are 5 main chapter which tells about the general information of the organization, the information of selected specific topic for the practical training report, the problems and also the recommendations that have been identified during the progress of the works. In chapter 1, it is about the information of the organization that I have undergoing my practical training. The scope of works, the function of the organization and the main structure of the organization have been identified. In chapter 2, it is about the details information from literature review based on the topic selected at the case study. From this chapter, it contents the definitions, functions, types and explanations. In chapter 3, it about the details information of the case study. The sequences of the works progress, data and results are based on the experiences and observation at the real construction site. In chapter 4, it concerns the identified problems occurring on the site construction. The recommendation works to the problems have been attached in the way to get the best result of the construction. Universiti Teknologi Mara, Perak 2018 Monograph NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/48868/1/48868.pdf ID48868 Amir Hamzah, Noor A’kashah (2018) Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah. Industrial / Practical Training Report. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Concrete
Strength and testing
Reinforced concrete
Malaysia
Piles and pile-driving
spellingShingle Concrete
Strength and testing
Reinforced concrete
Malaysia
Piles and pile-driving
Amir Hamzah, Noor A’kashah
Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah
description This report is about all the information about the case study through practical training under Jabatan Kerja Raya (JKR) Daerah Bera. The topic of the practical training report is The Installation of Precast Reinforcement Concrete (R.C) Piles for Double-Storey Building. The selected topic is based on the work in progress at the construction site which is the substructure works. In this report, the are 5 main chapter which tells about the general information of the organization, the information of selected specific topic for the practical training report, the problems and also the recommendations that have been identified during the progress of the works. In chapter 1, it is about the information of the organization that I have undergoing my practical training. The scope of works, the function of the organization and the main structure of the organization have been identified. In chapter 2, it is about the details information from literature review based on the topic selected at the case study. From this chapter, it contents the definitions, functions, types and explanations. In chapter 3, it about the details information of the case study. The sequences of the works progress, data and results are based on the experiences and observation at the real construction site. In chapter 4, it concerns the identified problems occurring on the site construction. The recommendation works to the problems have been attached in the way to get the best result of the construction.
format Monograph
author Amir Hamzah, Noor A’kashah
author_facet Amir Hamzah, Noor A’kashah
author_sort Amir Hamzah, Noor A’kashah
title Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah
title_short Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah
title_full Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah
title_fullStr Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah
title_full_unstemmed Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah
title_sort installation of precast reinforcement concrete (r.c) piles for double-storey building / noor a’kashah amir hamzah
publisher Universiti Teknologi Mara, Perak
publishDate 2018
url http://ir.uitm.edu.my/id/eprint/48868/1/48868.pdf
http://ir.uitm.edu.my/id/eprint/48868/
_version_ 1706960448906067968
score 13.211869