Building condition survey report at Lot 2, Jalan Hang Lekiu, Bandar Hilir Melaka / Syarifah Nur Adlin Syed Abdul Wahed

This report is about all the general and technical information about the company that have been selected. This report has 4 chapter which included all the general information and technical information about building condition survey at Lot No.2, Jalan Hang Lekiu, Bandar Hilir, Melaka. This report ca...

Full description

Saved in:
Bibliographic Details
Main Author: Syed Abdul Wahed, Syarifah Nur Adlin
Format: Monograph
Language:English
Published: Universiti Teknologi Mara, Perak 2018
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/48761/1/48761.pdf
http://ir.uitm.edu.my/id/eprint/48761/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This report is about all the general and technical information about the company that have been selected. This report has 4 chapter which included all the general information and technical information about building condition survey at Lot No.2, Jalan Hang Lekiu, Bandar Hilir, Melaka. This report can be used as a reference for Heritage Architectural Building Surveys before construction works, HABS (Stage 1) The first chapter in this report is detail of information of the company. In this chapter, all the general information about the background of the company and the organization company. This chapter include the scope of work and location of the company. It also have list of project that have been done by the company. The second chapter give out information about the conservation heritage building and building condition survey. This chapter provided the information about the detailing the conservation works and how to do the building condition survey based on the secondary resources. The third chapter is a case study which is located at Lot No. 2, Jalan Hang Lekiu, Bandar Hilir, Melaka. The condition survey were conducted in the area and the building defect has been stated in this report.