In a nutshell, this practical training report is about the process and method that involved for the construction of the suspended concrete reinforced floor slab. I have made this practical training report based on my experience for 4 months on the site. This practical training report have some parts...

Full description

Saved in:
Bibliographic Details
Main Author: A. Rahman, Nur Anis
Format: Monograph
Language:English
Published: Universiti Teknologi Mara, Perak 2014
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/48600/1/48600.pdf
http://ir.uitm.edu.my/id/eprint/48600/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.48600
record_format eprints
spelling my.uitm.ir.486002021-07-13T05:21:15Z http://ir.uitm.edu.my/id/eprint/48600/ Construction of reinforced concrete floor slab / Nur Anis A. Rahman A. Rahman, Nur Anis Concrete Slabs Reinforced concrete Malaysia In a nutshell, this practical training report is about the process and method that involved for the construction of the suspended concrete reinforced floor slab. I have made this practical training report based on my experience for 4 months on the site. This practical training report have some parts, it is divided with the company background and my case study background. Based on the my experience and observation at the site ,the construction of the reinforced concrete floor slab very complicated to be construct. There have many methods that must to be doing and to be process to construct a reinforced concrete floor slab. In this report there be contained the summary of the construction of the reinforced concrete floor slab, that in this report there include the material, equipment, components and machinery that used for the construction of the reinforced concrete floor slab. Besides, in this practical training report also, I have included with the method of the how to construct the reinforced concrete floor slab. Hence, It is started from the formwork for the floor slab, from make it the floor slab board that made from the timber and wood, installation of beam steel structure, installation of the service pipe and wiring conduit such as sewerage pipe, electrical conduit and telecommunication conduit, installation of Brc on the floor formwork and then placement work for the concrete. When the construction process of the reinforced concrete floor slab being held, there have several problems that arise that have been identified for the construction of the floor slab,this practical training report has been include with the several comment and recommendation from my opinion that can solve the problems that arise. In conclusion, from this practical training report that I has done can explain with detailed to all the reader about the construction of the reinforced concrete floor slab. Universiti Teknologi Mara, Perak 2014 Monograph NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/48600/1/48600.pdf ID48600 A. Rahman, Nur Anis (2014) Construction of reinforced concrete floor slab / Nur Anis A. Rahman. Industrial / Practical Training Report. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Concrete
Slabs
Reinforced concrete
Malaysia
spellingShingle Concrete
Slabs
Reinforced concrete
Malaysia
A. Rahman, Nur Anis
Construction of reinforced concrete floor slab / Nur Anis A. Rahman
description In a nutshell, this practical training report is about the process and method that involved for the construction of the suspended concrete reinforced floor slab. I have made this practical training report based on my experience for 4 months on the site. This practical training report have some parts, it is divided with the company background and my case study background. Based on the my experience and observation at the site ,the construction of the reinforced concrete floor slab very complicated to be construct. There have many methods that must to be doing and to be process to construct a reinforced concrete floor slab. In this report there be contained the summary of the construction of the reinforced concrete floor slab, that in this report there include the material, equipment, components and machinery that used for the construction of the reinforced concrete floor slab. Besides, in this practical training report also, I have included with the method of the how to construct the reinforced concrete floor slab. Hence, It is started from the formwork for the floor slab, from make it the floor slab board that made from the timber and wood, installation of beam steel structure, installation of the service pipe and wiring conduit such as sewerage pipe, electrical conduit and telecommunication conduit, installation of Brc on the floor formwork and then placement work for the concrete. When the construction process of the reinforced concrete floor slab being held, there have several problems that arise that have been identified for the construction of the floor slab,this practical training report has been include with the several comment and recommendation from my opinion that can solve the problems that arise. In conclusion, from this practical training report that I has done can explain with detailed to all the reader about the construction of the reinforced concrete floor slab.
format Monograph
author A. Rahman, Nur Anis
author_facet A. Rahman, Nur Anis
author_sort A. Rahman, Nur Anis
title Construction of reinforced concrete floor slab / Nur Anis A. Rahman
title_short Construction of reinforced concrete floor slab / Nur Anis A. Rahman
title_full Construction of reinforced concrete floor slab / Nur Anis A. Rahman
title_fullStr Construction of reinforced concrete floor slab / Nur Anis A. Rahman
title_full_unstemmed Construction of reinforced concrete floor slab / Nur Anis A. Rahman
title_sort construction of reinforced concrete floor slab / nur anis a. rahman
publisher Universiti Teknologi Mara, Perak
publishDate 2014
url http://ir.uitm.edu.my/id/eprint/48600/1/48600.pdf
http://ir.uitm.edu.my/id/eprint/48600/
_version_ 1706960420254777344
score 13.209306