Design and build contract and its effect to the maintenance / Nurul Hasmiera Mohd Nooh
The preparation of this dissertation was mainly motivated by the Design and Build procurement method and its effect to the maintenance. The study has specific aim and objectives to achieve in the end. The primary aim to of this study is to identify the cause of defect normally occur in building that...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/48311/1/48311.pdf https://ir.uitm.edu.my/id/eprint/48311/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.48311 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.483112023-01-12T04:27:45Z https://ir.uitm.edu.my/id/eprint/48311/ Design and build contract and its effect to the maintenance / Nurul Hasmiera Mohd Nooh Mohd Nooh, Nurul Hasmiera Architectural drawing and design Maintenance and repair The preparation of this dissertation was mainly motivated by the Design and Build procurement method and its effect to the maintenance. The study has specific aim and objectives to achieve in the end. The primary aim to of this study is to identify the cause of defect normally occur in building that use Design and Build procurement method. Second objectives are to study impact of Design and Build procurement method to the maintenance. Lastly, propose solution and recommendation in order to reduce the maintenance problem. This dissertation includes the outlines of the introduction to the subjects and each sub topic, and also explained elaborate about Design and Build procurement method, maintenance and defects. Research methodology which had been applied in the 3 case studies is through observations and questionnaire to maintenance department and facilities department. Then analysis and finding through the data collection. From analysis it can be that the -cause of defect normally occur in building that use Design and Build procurement method is substandard product, lack of experience and excellent of workmanship, lack installation method and environment factor. Then, the factor that impacts of the Design and Build contract to maintenance like general aspect, time aspect, quality aspect and design aspect. Finally, conclusion from the research findings and development of recommendation for solve of the problems. 2011 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/48311/1/48311.pdf Design and build contract and its effect to the maintenance / Nurul Hasmiera Mohd Nooh. (2011) Degree thesis, thesis, Universiti Teknologi MARA (UiTM). |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Architectural drawing and design Maintenance and repair |
spellingShingle |
Architectural drawing and design Maintenance and repair Mohd Nooh, Nurul Hasmiera Design and build contract and its effect to the maintenance / Nurul Hasmiera Mohd Nooh |
description |
The preparation of this dissertation was mainly motivated by the Design and Build procurement method and its effect to the maintenance. The study has specific aim and objectives to achieve in the end. The primary aim to of this study is to identify the cause of defect normally occur in building that use Design and Build procurement method. Second objectives are to study impact of Design and Build procurement method to the maintenance. Lastly, propose solution and recommendation in order to reduce the maintenance problem. This dissertation includes the outlines of the introduction to the subjects and each sub topic, and also explained elaborate about Design and Build procurement method, maintenance and defects. Research methodology which had been applied in the 3 case studies is through observations and questionnaire to maintenance department and facilities department. Then analysis and finding through the data collection. From analysis it can be that the -cause of defect normally occur in building that use Design and Build procurement method is substandard product, lack of experience and excellent of workmanship, lack installation method and environment factor. Then, the factor that impacts of the Design and Build contract to maintenance like general aspect, time aspect, quality aspect and design aspect. Finally, conclusion from the research findings and development of recommendation for solve of the problems. |
format |
Thesis |
author |
Mohd Nooh, Nurul Hasmiera |
author_facet |
Mohd Nooh, Nurul Hasmiera |
author_sort |
Mohd Nooh, Nurul Hasmiera |
title |
Design and build contract and its effect to the maintenance / Nurul Hasmiera Mohd Nooh |
title_short |
Design and build contract and its effect to the maintenance / Nurul Hasmiera Mohd Nooh |
title_full |
Design and build contract and its effect to the maintenance / Nurul Hasmiera Mohd Nooh |
title_fullStr |
Design and build contract and its effect to the maintenance / Nurul Hasmiera Mohd Nooh |
title_full_unstemmed |
Design and build contract and its effect to the maintenance / Nurul Hasmiera Mohd Nooh |
title_sort |
design and build contract and its effect to the maintenance / nurul hasmiera mohd nooh |
publishDate |
2011 |
url |
https://ir.uitm.edu.my/id/eprint/48311/1/48311.pdf https://ir.uitm.edu.my/id/eprint/48311/ |
_version_ |
1755875996163112960 |
score |
13.214268 |