Upgrading works / Nurul Hidayah Mohd Faizul Aris
This report is about the company that I choose to undergo my practical training. It contains five chapter, which are the details of company, literature review about the project, the case study, problems and recommendation and conclusion. In the opening in chapter 1, it is about detail of the compan...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2018
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/46735/1/46735.pdf http://ir.uitm.edu.my/id/eprint/46735/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.46735 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.467352021-06-03T16:24:49Z http://ir.uitm.edu.my/id/eprint/46735/ Upgrading works / Nurul Hidayah Mohd Faizul Aris Mohd Faizul Aris, Nurul Hidayah Industry Construction industry Malaysia Management of the construction site. Superintendence of building construction This report is about the company that I choose to undergo my practical training. It contains five chapter, which are the details of company, literature review about the project, the case study, problems and recommendation and conclusion. In the opening in chapter 1, it is about detail of the company. This includes the background of the company, the network collaboration, the organization chart, and also their vision, mission and objectives. It is also contain location plan of JKR to know more precise where the location of the building. The second chapter explain about the literature review/ theoretical study of the selected project which is upgrading work. In this chapter it involves the literature review/ theoretical study of upgrading work, carpet, curb and interlocking floor mats. This chapter also talk about the process of method construction of the material. During my training period, I have been brought to the site where my case study took place and it’s all been recorded in chapter 3. This chapter also tell about the background of the client and contractor involved. Chapter 4 is about the problem and recommendation of my case study. It is customary for every construction to experience some mistakes and problems. Due to that matter, this chapter will suggest the recommendation of the problem that had occur and lastly chapter 5 is a conclusion of the report. Universiti Teknologi Mara, Perak 2018 Monograph NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/46735/1/46735.pdf ID46735 Mohd Faizul Aris, Nurul Hidayah (2018) Upgrading works / Nurul Hidayah Mohd Faizul Aris. Industrial / Practical Training Report. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Industry Construction industry Malaysia Management of the construction site. Superintendence of building construction |
spellingShingle |
Industry Construction industry Malaysia Management of the construction site. Superintendence of building construction Mohd Faizul Aris, Nurul Hidayah Upgrading works / Nurul Hidayah Mohd Faizul Aris |
description |
This report is about the company that I choose to undergo my practical training. It contains five chapter, which are the details of company, literature review about the project, the case study, problems and recommendation and conclusion.
In the opening in chapter 1, it is about detail of the company. This includes the background of the company, the network collaboration, the organization chart, and also their vision, mission and objectives. It is also contain location plan of JKR to know more precise where the location of the building. The second chapter explain about the literature review/ theoretical study of the selected project which is upgrading work. In this chapter it involves the literature review/ theoretical study of upgrading work, carpet, curb and interlocking floor mats. This chapter also talk about the process of method construction of the material. During my training period, I have been brought to the site where my case study took place and it’s all been recorded in chapter 3. This chapter also tell about the background of the client and contractor involved.
Chapter 4 is about the problem and recommendation of my case study. It is customary for every construction to experience some mistakes and problems. Due to that matter, this chapter will suggest the recommendation of the problem that had occur and lastly chapter 5 is a conclusion of the report. |
format |
Monograph |
author |
Mohd Faizul Aris, Nurul Hidayah |
author_facet |
Mohd Faizul Aris, Nurul Hidayah |
author_sort |
Mohd Faizul Aris, Nurul Hidayah |
title |
Upgrading works / Nurul Hidayah Mohd Faizul Aris |
title_short |
Upgrading works / Nurul Hidayah Mohd Faizul Aris |
title_full |
Upgrading works / Nurul Hidayah Mohd Faizul Aris |
title_fullStr |
Upgrading works / Nurul Hidayah Mohd Faizul Aris |
title_full_unstemmed |
Upgrading works / Nurul Hidayah Mohd Faizul Aris |
title_sort |
upgrading works / nurul hidayah mohd faizul aris |
publisher |
Universiti Teknologi Mara, Perak |
publishDate |
2018 |
url |
http://ir.uitm.edu.my/id/eprint/46735/1/46735.pdf http://ir.uitm.edu.my/id/eprint/46735/ |
_version_ |
1702172638738120704 |
score |
13.214268 |