Integrated biological treatment of sewage / Ummi Hazwani Ab Hamid.

The purpose of this study is to characterize sewage from Kolej Mawar before and after an integrated biological sewage treatment and to study the effectiveness of different stage of biological treatment in the present of Effective Microorganism (EM). The removal efficiency from Kolej Mawar oxidation...

Full description

Saved in:
Bibliographic Details
Main Author: Ab Hamid, Ummi Hazwani
Format: Thesis
Language:English
Published: 2009
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/46314/1/46314.pdf
https://ir.uitm.edu.my/id/eprint/46314/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.46314
record_format eprints
spelling my.uitm.ir.463142022-11-09T04:46:19Z https://ir.uitm.edu.my/id/eprint/46314/ Integrated biological treatment of sewage / Ummi Hazwani Ab Hamid. Ab Hamid, Ummi Hazwani Sewage collection and disposal systems. Sewerage The purpose of this study is to characterize sewage from Kolej Mawar before and after an integrated biological sewage treatment and to study the effectiveness of different stage of biological treatment in the present of Effective Microorganism (EM). The removal efficiency from Kolej Mawar oxidation tank flow continuously through grounded constructed wetland (A) to the second point of measurement (B) and finally to the floating constructed wetland (C). These three different points were measured to evaluate the trends for the overall performance of sewage characteristics. The samples of sewage from Kolej Mawar were taken three times for each point of measurement. The average of three reading for each point was analysed. The flow inlet through the constructed wetland systems was controlled at the first day (14th August 2009) at high, second day (17th August 2009) at medium th and last day (19 August 2009) at low. Then, the experimental analysis was tested for the chemical oxygen demand (COD), removal of suspended solid (TSS), ammonium, chlorine included free chlorine and total chlorine, colour, turbidity, and dissolved oxygen (DO). From the results and analysis, the constructed wetland with present of EM have shown the ability to reduce the amount of chemical oxygen demand (COD), removal of suspended solid (TSS), ammonium, chlorine (free chlorine and total chlorine), colour, turbidity and dissolved oxygen (DO) from sewage at second point of measurement during medium flow. This integrated biological treatment of sewage has capability in treating and reducing sewage constituents. 2009 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/46314/1/46314.pdf Integrated biological treatment of sewage / Ummi Hazwani Ab Hamid. (2009) Degree thesis, thesis, Universiti Teknologi MARA.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Sewage collection and disposal systems. Sewerage
spellingShingle Sewage collection and disposal systems. Sewerage
Ab Hamid, Ummi Hazwani
Integrated biological treatment of sewage / Ummi Hazwani Ab Hamid.
description The purpose of this study is to characterize sewage from Kolej Mawar before and after an integrated biological sewage treatment and to study the effectiveness of different stage of biological treatment in the present of Effective Microorganism (EM). The removal efficiency from Kolej Mawar oxidation tank flow continuously through grounded constructed wetland (A) to the second point of measurement (B) and finally to the floating constructed wetland (C). These three different points were measured to evaluate the trends for the overall performance of sewage characteristics. The samples of sewage from Kolej Mawar were taken three times for each point of measurement. The average of three reading for each point was analysed. The flow inlet through the constructed wetland systems was controlled at the first day (14th August 2009) at high, second day (17th August 2009) at medium th and last day (19 August 2009) at low. Then, the experimental analysis was tested for the chemical oxygen demand (COD), removal of suspended solid (TSS), ammonium, chlorine included free chlorine and total chlorine, colour, turbidity, and dissolved oxygen (DO). From the results and analysis, the constructed wetland with present of EM have shown the ability to reduce the amount of chemical oxygen demand (COD), removal of suspended solid (TSS), ammonium, chlorine (free chlorine and total chlorine), colour, turbidity and dissolved oxygen (DO) from sewage at second point of measurement during medium flow. This integrated biological treatment of sewage has capability in treating and reducing sewage constituents.
format Thesis
author Ab Hamid, Ummi Hazwani
author_facet Ab Hamid, Ummi Hazwani
author_sort Ab Hamid, Ummi Hazwani
title Integrated biological treatment of sewage / Ummi Hazwani Ab Hamid.
title_short Integrated biological treatment of sewage / Ummi Hazwani Ab Hamid.
title_full Integrated biological treatment of sewage / Ummi Hazwani Ab Hamid.
title_fullStr Integrated biological treatment of sewage / Ummi Hazwani Ab Hamid.
title_full_unstemmed Integrated biological treatment of sewage / Ummi Hazwani Ab Hamid.
title_sort integrated biological treatment of sewage / ummi hazwani ab hamid.
publishDate 2009
url https://ir.uitm.edu.my/id/eprint/46314/1/46314.pdf
https://ir.uitm.edu.my/id/eprint/46314/
_version_ 1751539827624378368
score 13.1944895