The variation of prices in civil engineering works / Muhammad Nazree Mansor
This report briefly described the calculation for the Variation of Price for the government project. The government represented by the Public Work Department had announced several provision and materials which are included in the claim for the Variation of Price. It is made based on several months e...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/44775/1/44775.pdf http://ir.uitm.edu.my/id/eprint/44775/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.44775 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.447752021-04-15T02:57:20Z http://ir.uitm.edu.my/id/eprint/44775/ The variation of prices in civil engineering works / Muhammad Nazree Mansor Mansor, Muhammad Nazree Life cycle costing. Cost effectiveness Engineering mathematics. Engineering analysis Estimates. Measurements. Quantities and cost This report briefly described the calculation for the Variation of Price for the government project. The government represented by the Public Work Department had announced several provision and materials which are included in the claim for the Variation of Price. It is made based on several months experience at the RME Sdn. Bhd. at the Contract and Technical Department. This report is divided into several chapters which include the company’s and project’s background. From the experience here, before this, the calculation is made by using the manual ways, recently the calculation for the Variation of Price can be calculated by easier ways using the Q’Best software which had been invented by the Terengganu Quantity Surveying Divisions. Other than that, the calculation which being made by the Consultant, ATZ Consult Sdn. Bhd. had created some questions by the Contractors. As a conclusion, this report has provided sufficient information on the Variation of Price and the ways to calculate for the readers. 2014 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/44775/1/44775.pdf Mansor, Muhammad Nazree (2014) The variation of prices in civil engineering works / Muhammad Nazree Mansor. [Student Project] (Unpublished) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Life cycle costing. Cost effectiveness Engineering mathematics. Engineering analysis Estimates. Measurements. Quantities and cost |
spellingShingle |
Life cycle costing. Cost effectiveness Engineering mathematics. Engineering analysis Estimates. Measurements. Quantities and cost Mansor, Muhammad Nazree The variation of prices in civil engineering works / Muhammad Nazree Mansor |
description |
This report briefly described the calculation for the Variation of Price for the government project. The government represented by the Public Work Department had announced several provision and materials which are included in the claim for the Variation of Price. It is made based on several months experience at the RME Sdn. Bhd. at the Contract and Technical Department. This report is divided into several chapters which include the company’s and project’s background. From the experience here, before this, the calculation is made by using the manual ways, recently the calculation for the Variation of Price can be calculated by easier ways using the Q’Best software which had been invented by the Terengganu Quantity Surveying Divisions. Other than that, the calculation which being made by the Consultant, ATZ Consult Sdn. Bhd. had created some questions by the Contractors. As a conclusion, this report has provided sufficient information on the Variation of Price and the ways to calculate for the readers. |
format |
Student Project |
author |
Mansor, Muhammad Nazree |
author_facet |
Mansor, Muhammad Nazree |
author_sort |
Mansor, Muhammad Nazree |
title |
The variation of prices in civil engineering works / Muhammad Nazree Mansor |
title_short |
The variation of prices in civil engineering works / Muhammad Nazree Mansor |
title_full |
The variation of prices in civil engineering works / Muhammad Nazree Mansor |
title_fullStr |
The variation of prices in civil engineering works / Muhammad Nazree Mansor |
title_full_unstemmed |
The variation of prices in civil engineering works / Muhammad Nazree Mansor |
title_sort |
variation of prices in civil engineering works / muhammad nazree mansor |
publishDate |
2014 |
url |
http://ir.uitm.edu.my/id/eprint/44775/1/44775.pdf http://ir.uitm.edu.my/id/eprint/44775/ |
_version_ |
1698700272656711680 |
score |
13.160551 |